Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
| No | List of product/services | Quantity | Unit | Description | Location | Specification | Note | Feature |
|---|---|---|---|---|---|---|---|---|
1 |
Battery |
38 |
Female |
I. Requirements for the battery pack that needs to be replaced A. General requirements - 100% new equipment - Committed to goods being compatible with the 160kVA UPS model: SOCOMEC-DELPHYS Green Power 2.0 used for the existing Artis Zee Ceiling - Siemens angiography system of Can Tho Central General Hospital B. Requirements for technical parameters (must meet technical or equivalent) 1. Type of goods - Dry, sealed batteries, acid - lead type, AGM technology - Shell and cap made of ABS (Acrylonitrile - Butadiene Styrene Copolymer). - Appearance: The outer electrode in the form of a cone (Ecu) is firmly fixed to the battery, with color distinction for the negative and positive electrodes, the outer surface of the electrode protrudes no more than 5mm from the outer surface of the battery shell. 2. Year of manufacture - Released no more than 6 months from the date of manufacture, 2025 or later C. Detailed technical requirements - Nominal voltage of each battery: 12V - Rated capacity at 25°C: 120Ah (10hr) at 10.8V - Design life: ≥ 10 years at 20°C according to Eurobat standards - Battery shell: ABS material - Self-discharge after 1 month, at 20°C: ≤ 3% - Internal resistance (after full charge at 25°C): ≤ 4.5 mΩ - Pole structure: made from lead dioxide - Identification on the battery: 1 negative pole, 1 positive pole marked by color to classify polarity: (-) black, (+) red - Battery pole head, pole classification: using M8 bolt rod, standard pole classification T16 - Weight: ≥ 34.8 Kg - Dimensions (mm): 409 x 173 x 208 - Maximum discharge current (5s): 950A - Discharge current in 15-minute discharge mode, final voltage 9.6V at 25°C: ≥ 202A - Discharge current in 30-minute discharge mode, final voltage 9.9V at 25°C: ≥ 118A - Discharge current in 1-hour discharge mode, final voltage 10.2V at 25°C: ≥ 71.2A - Discharge current in 2-hour discharge mode, final voltage 10.5V at 25°C: ≥ 42.6A - Discharge current in 10-hour discharge mode, final voltage 10.8V at 25°C: ≥ 12A - Discharge capacity in 15-minute discharge mode, final voltage 9.6V at 25°C: ≥ 2213W - Discharge power in 30-minute discharge mode, final voltage 9.9V at 25°C: ≥ 1325W - Discharge power in 60-minute discharge mode, final voltage 10.2V at 25°C: ≥ 812W - Discharge power in 2-hour discharge mode, final voltage 10.5V at 25°C: ≥ 492W - Discharge power in 20-hour discharge mode, final voltage 10.8V at 25°C: ≥ 76.2W - Maximum charging current: ≤ 36A - Regular charging voltage at 25°C: 13.5V÷13.8V - Cycle charging voltage at 25°C: 14.5V÷15V - Temperature compensation coefficient: + Boost charging: -30mV/°C + Floating charge: -18mV/°C - Can operate in a temperature range when charging from 0°C to 50°C. - Can operate in a temperature range when discharging from 0°C to 50°C - Can be stored in a temperature range from -20°C to 50°C II. Other requirements Requirements for related services: - Related services are a package service that includes all costs to ensure that the goods and equipment are provided, installed, tested, operated, instructed on use, and meet the requirements for acceptance and put into use. - The supplier must commit to instructing on use when put into use. - Delivery and installation at Can Tho Central General Hospital - Commitment to send technicians to the hospital within ≤ 48 hours of receiving the hospital's request (in writing or by phone) to repair equipment damage (if any) during the warranty period. - Delivery time: ≤ 120 days from the date of signing the contract - Warranty period: ≥ 12 months from the date of signing the acceptance. - Contract implementation time: 60 days from the date of signing the contract. - Periodic maintenance during the warranty period: According to the manufacturer's regulations. - Must have a team of engineers trained by the manufacturer. - User manual (English + Vietnamese) - Provide CO, CQ, Import documents for imported goods upon delivery - For domestically produced goods, there must be a factory certificate. - Warranty, maintenance, repair and maintenance services during the warranty period |
Can Tho Central General Hospital |
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register
Select columns to display
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
Similar goods purchased by Investor CAN THO CENTRAL GENERAL HOSPITAL:
No similar goods purchased by the Investor were found.
Similar goods purchased by other Investor excluding CAN THO CENTRAL GENERAL HOSPITAL:
No similar goods have been found that other Investor have purchased.
Similar goods for which the bidding results of the Ministry of Health have been announced:
No similar goods have been found in the bidding results of the Ministry of Health.