Component project DATP2-1: Construction of expressway from Toc Tien - Chau Pha intersection to Chau Duc bridge (including Chau Duc bridge at the border of Dong Nai province)

    Watching Watching    
Notification of interest survey Project Preliminary assessment of capacity and experience Investor selection plan Investment Invitation Notice LCNDT Result
TBKSSQT ID
IB2600150849-00
Posting Status
Đã đăng tải
Investment policy code
IP2600000013-00
Views
34
New technology/high-tech project
No
Project with special elements
No
Projects in industries and occupations that have not yet been marketed to foreign investors
No
Name of project
Component project DATP2-1: Construction of expressway from Toc Tien - Chau Pha intersection to Chau Duc bridge (including Chau Duc bridge at the border of Dong Nai province)
Project objectives
Building a strategic transport axis connecting the Southeast region with the Southwest and Central Highlands, promoting the circulation of goods from industrial parks and urban areas to seaports and airports and vice versa; connecting urban areas and industrial parks in the region, creating regional links, socio-economic development of the southern key economic region; reduce traffic pressure for the urban center area; create new development space to exploit the potential of land resources and take advantage of areas with favorable conditions for urban development, contributing to regulating population in inner-city areas; successfully implement the goals and tasks of socio-economic development, ensuring national defense and security according to the Resolution of the 13th National Congress and the Party's resolutions
Scale
Investment scope: - Invest about 159.31 km, divided into 10 component projects. - In which the DATP2-1 component project has a route length of about 18.23km. With the starting point at Toc Tien - Chau Pha intersection (intersection area with Bien Hoa - Vung Tau Expressway and Provincial Road DT.992). The end point intersects with Dong Nai province at Bau Can lake area Investment scale: - Complete phase: Expressway has a design speed of 100 km/h, with 8 express lanes; The total width of the roadbed (including the expressway and parallel road) is Bbed = 74.5 m. - Phase 1: Diversified investment with scale of 04 expressway lanes, design speed of 100 km/h, roadbed width Base = 25.5m ÷ 27.0m according to National Technical Regulations on Expressway QCVN 117: 2024/BGTVT and Highway Motorway Standards - Design Requirements TCVN 5729 - 2012. - Intersection design: arrange intersection with Bien Hoa - Vung Tau expressway; Intersection with DT991 road; Intersection with National Highway 51C (Planning), in which the intersection with National Highway 51C has not been invested in at this stage. - Project group: Group A; - Type and level of construction: traffic works, level I.
Project location
Tan Thanh Ward, Ho Chi Minh City
Chau Pha Commune, Ho Chi Minh City
Chau Duc Commune, Ho Chi Minh City
Contract Type
BOT
Execution time
5 years
Preliminary total investment
4.776.400.000.000 VND
Project capital structure
- Investor's Equity (VND): 705.400.000.000
- Loans and other legal capital sources of the Investor (VND): 4.071.000.000.000
- State capital in the project (if any) (VND): 0
Mechanism for sharing revenue increases and decreases

- The mechanism for sharing the increase and decrease in revenue expected to be used to pay for the decrease in project revenue shall comply with the provisions of Article 82 of the Law on Investment in the form of public-private partnership in 2020, which has been amended and supplemented with a number of Articles by Law No. 57/2024/QH15 dated November 29, 2024, Law No. 90/2025/QH15 dated June 25, 2020. 2025 and Decree No. 28/2021/ND-CP dated March 26, 2021 of the Government regulating the financial management mechanism of investment projects according to the public-private partnership method. - Expected capital source to use to pay for revenue reduction: from the Ho Chi Minh City Budget reserve.
Project preparation unit name
vn0302282248 Ban Quản lý dự án đầu tư xây dựng các công trình giao thông

Authorized state agency's information

Authorized Agency
Ban Quản lý dự án đầu tư xây dựng các công trình giao thông

The survey notice information

Method of registering interest in project implementation
Over the air
Location for issuing KSSQT notice
https://muasamcong.mpi.gov.vn
Location to receive registration documents
https://muasamcong.mpi.gov.vn
Deadline for registration application submission
14:30 24/04/2026

Project decisions

Approval ID
220/2025
Date of signing
16:59 27/06/2025
Authorized state agency
Quốc hội
REOI has been signed and stamped by the Authorized state agency
TBKSSQT ID
Investment policy code
Deadline for submission of TBKSQT
Time to complete opening TBKSQT
Bid opening status
Number of investors
Name of project
Contract Type
Total investment
Authorized Agency
You did not use the site, Click here to remain logged. Timeout: 60 second