008-20-TD-RDT-QS

Watching          
DauThau.info discovered that this project's data collected from the new National Bidding Network System has differences in the investor compared to the data on the old system as follows:
 ⚬ New system: VIETTEL AEROSPACE INSTITUTE
 ⚬ Old system: Tập đoàn Công nghiệp - Viễn thông Quân đội
In addition, the bidding information related to this project also has discrepancies regarding the investor, specifically:
- The following contractor selection plans have the investor VIETTEL GROUP:
 ⚬ LCCT Phase 1 in 2022 for 07 bidding packages

- The following contractor selection plans have the investor Ban An toàn giao thông thành phố Cần Thơ:
 ⚬ Dissemination of traffic safety and order maintenance efforts through mass media in 2023.

- The following contractor selection plans have the investor :
 ⚬ Dismantling, installing and transporting the inspection garage from the Customs Inspection Department to the Customs Inspection Sub-Department 5

 ⚬ Building Vinh Tien block culture house, Nghi Huong ward, Cua Lo town

- The following contractor selection plans have the investor :
 ⚬ Contractor selection plan for package 35/2021/HKVT-PT

 ⚬ Approving the LCA for the package 25/2021/HKVT-PT; 26/2021/HKVT-PT

 ⚬ KHLCNT for 05 bidding packages: Procurement of electrical and electronic components and materials, Procurement of PCB circuits by design, Procurement of mechanical details, design test jigs, Procurement of yarn winding machines, Procurement of valves cut according to the design of subject 008-20-TD-RDT-QS

- The following bidding packages have the investor Viettel Aerospace Institute:
 ⚬ 26/2021/HKVT-PT Hire a service to repair 01 guide rail

 ⚬ 09 2021 HKVT-PT Procurement of electrical and electronic components

 ⚬ 35/2021/HKVT-PT Procurement of rubber seals

 ⚬ 25/2021/HKVT-PT Procurement of 08 guide rails and 07 fuel pipeline systems

 ⚬ 20 2021 HKVT-PT Procurement of winding machines

 ⚬ 21 2021 HKVT-PT Procurement of cut-off valves by design

 ⚬ 10 2021 HKVT-PT Procurement of PCB circuits by design

 ⚬ 11 2021 HKVT-PT Procurement of mechanical details, test jigs according to design

 ⚬ 65 2022 HKVT-PT Procurement of Fuze isolating power supplies, VITAN locators and other integrated design supplies

 ⚬ 120 2022 HKVT-PT Renting services to keep and tow ships

 ⚬ 05 2022 HKVT-PT Procurement of composite materials

 ⚬ 66 2022 HKVT-PT Procurement of materials and components

 ⚬ 67 2022 HKVT-PT Procurement of electromechanical equipment: Drying cabinet, torch, motor, inverter, gear pump, sensor, throttle, shaft coupling, battery

 ⚬ 69 2022 HKVT-PT Procurement of molds and specialized pipes made of composite

- The following bidding packages have the investor Chi cục Kiểm định hải quan:
 ⚬ Dismantling, installing and transporting the inspection garage from the Customs Inspection Department to the Customs Inspection Sub-Department 5

- The following bidding packages have the investor CÔNG TY CỔ PHẦN XÂY DỰNG VÀ THƯƠNG MẠI CÔNG CƯỜNG:
 ⚬ The whole construction part
Click để xem đầy đủClick để thu gọn
Found: 22:16 19/01/2021
Project number
20200844817-00
Notice type
Real announcement
Project name
008-20-TD-RDT-QS
Investor ID
vnz000004587
Project Category
Group A
Project management Type
Another form
Use of ODA funds
No
Investment Total Value
To view full information please Login or Register
Project approval ID
38/QĐ-CNVTQĐ-QLĐT
Project approval date
27/05/2020
Approval documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611

Contractor selection plans for this project

NO Contractor selection plan ID Contractor selection plan name Total investment
1
547.083.574.000 VND
2
1.010.796.850 VND
3
95.712.060 VND
4
6.428.109.000 VND
5
547.083.574.000 VND
6
547.083.574.000 VND
7
547.083.574.000 VND
Total amount
2.195.868.913.910 VND

Statistical table of bidding packages under the project

Statistics by type of bidding package Statistics by form Online bidding value (billion VND) Number of bidding packages whose results have been posted
Goods Civil Works Consulting Other categories Non-Consulting Online Offline
0 1 3 17 1 1 36 5.46 16
You did not use the site, Click here to remain logged. Timeout: 60 second