DauThau.info discovered that this project's data collected from the new National Bidding Network System has differences in the investor compared to the data on the old system as follows:
⚬ New system: Công ty TNHH Đầu tư Xây dựng Thương mại và Dịch vụ Hiệp Phát
⚬ Old system: Ban Quản lý dự án xây dựng công trình giao thông Cà Mau
In addition, the bidding information related to this project also has discrepancies regarding the investor, specifically:
- The following contractor selection plans have the investor :
⚬ Component 2 (investment project to build East-West axis) of Ong Doc River Bridge Construction Project, East-West Axis and Ganh Hao Bridge
- The following bidding packages have the investor CÔNG TY TNHH ĐẦU TƯ XÂY DỰNG THƯƠNG MẠI VÀ DỊCH VỤ HIỆP PHÁT:
⚬ Package 40: Construction of the section from Km 16+080 to Km17+053 and the section from Km 17+453 to Km17+992 and Cay No Bridge
⚬ Package No. 33: Construction of Muoi Toi bridge
⚬ Package No. 31: Construction of Bao Vung bridge
⚬ Package number 38: Construction of works from Km 15+332 to Km15+680 and Kenh Ngang bridge
⚬ Package 29: Construction of the section from Km5+680 - Km6+370 and Dong Hung and Cai Gieng bridges
⚬ Package 26: Construction of the section from Km 0+000 to Km 0+240 and Lo Xe bridge
⚬ Package 27: Construction of the section from Km 0 +720 to Km 1 + 640 and Rau Dua and Xeo Quau bridges
⚬ Package 30: Construction of the section from Km6+640 - Km8 + 380
⚬ Package 10: Supervising the construction of works for package No. 27
⚬ Package 32: Construction of the section from Km 8+700 to Km11+440
⚬ Package 39: Construction of Nhi Nguyet Bridge
⚬ Package No. 36: Construction of Lung Sen Bridge
⚬ Package No. 34: Construction of Bao Vung Bridge 1
⚬ Package 35: Construction of the section from Km 12+603.38 to Km13+225.75 and Kenh Cung bridge
⚬ Package 28: Construction of the section from Km1+890 to Km 5+400
⚬ Package 37: Construction of the section from Km14+015.75 to Km14+435 and Cua Ga bridge
⚬ Package No. 73: Construction supervision of work Package No. 74
⚬ Package No. 76: Construction Insurance for Package No. 74
⚬ Package 74: Construction of Bay Hap bridge (including ensuring water traffic for construction)
Contractor selection plans for this project
NO | Contractor selection plan ID | Contractor selection plan name | Total investment |
---|---|---|---|
1
|
2.149.476.675.731 VND |
||
Total amount |
2.149.476.675.731 VND |
Statistical table of bidding packages under the project
Statistics by type of bidding package | Statistics by form | Online bidding value (billion VND) | Number of bidding packages whose results have been posted | |||||
---|---|---|---|---|---|---|---|---|
Goods | Civil Works | Consulting | Other categories | Non-Consulting | Online | Offline | ||
0 | 0 | 0 | 0 | 0 | 0 | 20 | 0.00 | 19 |
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.