Component project of construction investment of the Cam Lo - La Son section of the project to build a number of expressway sections on the East North - South route in the period 2017 - 2020

Watching          
Project Overall procurement plan Contractor selection plan Tender Notice Bid opening result Contractor selection result
DauThau.info discovered that this project's data collected from the new National Bidding Network System has differences in the investor compared to the data on the old system as follows:
 ⚬ New system: Bộ Giao thông vận tải
 ⚬ Old system: Bộ Giao thông vận tải
In addition, the bidding information related to this project also has discrepancies regarding the investor, specifically:
- The following contractor selection plans have the investor Bộ Giao thông vận tải:
 ⚬ Plan for selecting contractor for construction investment component project of Cam Lo - La Son section of the project to build a number of expressway sections on the East North - South route in the period 2017 - 2020

- The following contractor selection plans have the investor Ban Quản lý dự án Đường Hồ Chí Minh:
 ⚬ Adjusting the contractor selection plan for TV16 bidding package; TV17 belongs to the Cam Lo - La Son section construction investment component project of the project to build a number of expressway sections on the North - South Eastern route in the period of 2017 - 2020

- The following bidding packages have the investor Ban Quản lý dự án Đường Hồ Chí Minh:
 ⚬ Bidding package TV16: Consulting on preparing business investment project proposal documents, preparing bidding documents for rest stops.

 ⚬ Bidding package TV17: Consulting on verification of business investment project proposals, bidding documents for rest stops

- The following bidding packages have the investor Ban Quản lý dự án Đường Hồ Chí Minh:
 ⚬ Package RP1: Planning, clearing bombs, mines and explosives from Km0+000 - Km37+300

 ⚬ TV5 bidding package: Consulting to verify the estimate of construction and installation bidding packages

 ⚬ Tender package TV4: Technical design verification consultancy, traffic safety verification at the technical design stage for construction and installation bidding packages

 ⚬ Bidding package TV3: Survey consulting, technical design, estimating, installing land clearance piles for LGDB piles, preparing bidding documents for construction and installation packages of section Km69+000 - Km102+200

 ⚬ Bidding package TV2: Survey consulting, technical design, estimating, installing land clearance piles for LGDB piles, preparing bidding documents for construction and installation packages of section Km37+300 - Km69+000

 ⚬ Bidding package TV1: Consulting on survey, technical design, estimating, installing land clearance piles for LGDB piles, preparing bidding documents for construction and installation packages of section Km0+000 - Km37+300

 ⚬ TV8 package: Construction supervision consultant for the section Km69+000 - Km102+200

 ⚬ Tender package TV7: Construction supervision consultant Km26+500 - Km69+000

 ⚬ Package BH3: Construction insurance for construction and installation packages from Km69+000 - Km102+200

 ⚬ Package BH2: Construction insurance for construction and installation packages from Km26+500 - Km69+000

 ⚬ Package XL7: Construction and surveying, BVTC design section Km60+800 - Km69+000 (including bridges: Song Bo, overpass TL16, Huong Tra bridge)

 ⚬ Package XL4: Construction, survey and design of BVTC at Km37+300 - Km46+200 (including bridges: Nhi, Khe Ma)

 ⚬ Package XL11: Construction and design, construction and maintenance, section Km94+500-Km102+200 (including bridges: Khe Son, Khe Left, Song Nong, overpass TL15, overpass TL14B and Khe Son, Khe Left, Song Nong bridges on the TL15 connection collector)

 ⚬ Package XL6: Construction, survey and design of BVTC section Km52+500 - Km60+800 (Including bridges: Oh Oh, Cong Thanh; Ong Vang, Thanh Tan overpass)

 ⚬ Package XL10: Construction, survey and design of BVTC at section Km81+500 - Km94+500 (including bridge: Khai Dinh, bridge No. 6, bridge No.7, bridge Km88-Km88+987.07)

 ⚬ Package XL9: Construction, survey, design of financial protection section Km78+000 - Km81+500 (including bridges: Khe Thuong, Tuan, Chau E, TL12B overpass, National Highway 49 overpass, Hue bypass overpass)

 ⚬ Package XL8: Construction, survey, and design of financial protection section Km69+000 - Km78+000 (including bridges: bridge No. 4, Tu Ca, bridge No. 5, Tam Vinh, Khe Nuoc, Khe Ly)

 ⚬ Package XL5: Construction, survey, and design of BVTC at the Km46+200 - Km52+500 section (including bridges: O Lau, Bridge No. 2, overpass TL17, overpass TL9B, overpass TL11B)

 ⚬ Package XL3: Construction, survey and design of BVTC section Km26+500 - Km37+300 (including bridges: Nhuong, Khe Muong, Khe My Chanh, My Chanh, overpass HL57, overpass QL15D, bridge No.1 )

 ⚬ Package TV9: Consulting for environmental monitoring and monitoring during the construction of construction and installation packages

 ⚬ Package BH1: Construction insurance for construction and installation packages from Km0+000 - Km26+500

 ⚬ TV6 package: Construction supervision consultant for the section Km0+000 - 26+500

 ⚬ Package XL2: Construction, survey and design of BVTC at Km15+000 - Km26+500 (including bridges: Khe Chuon, Thach Han, Nhu Le 1, Nhu Le 2, overpass HL48B)

 ⚬ Package XL1: Construction, survey and design of BVTC at the Km0+000 - Km15+000 section (including bridges: Lai Phuoc, Khe Ai Tu, overpass TL579)
Click để xem đầy đủClick để thu gọn
Found: 13:49 19/01/2021
Project number
20180724910-00
Notice type
Real announcement
Project name
Component project of construction investment of the Cam Lo - La Son section of the project to build a number of expressway sections on the East North - South route in the period 2017 - 2020
Investor ID
vnz000013232
Project Category
Group A
Project management Type
Another form
Use of ODA funds
No
Investment Total Value
To view full information please Login or Register VNĐ
Amount in text format
Project approval ID
1291/QĐ-BGTVT
Project approval date
19/06/2018

Contractor selection plans for this project

NO Contractor selection plan ID Contractor selection plan name Total investment
1
7.669.307.000.000 VND
2
7.669.307.000.000 VND
Total amount
15.338.614.000.000 VND

Statistical table of bidding packages under the project

Statistics by type of bidding package Statistics by form Online bidding value (billion VND) Number of bidding packages whose results have been posted
Goods Civil Works Consulting Other categories Non-Consulting Online Offline
0 0 2 0 0 0 30 0.00 28
Greeting
Greeting,
You are not logged in, please log in to use our various functions for members.

You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!

If you are still not our member, please sign up.

Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.

Search for bid information
Click for advanced search
Statistical
  • 8808 Projects are waiting for contractors
  • 1242 Tender notices posted in the last 24 hours
  • 1870 Contractor selection plan posted in the last 24 hours
  • 25509 Tender notices posted in the past month
  • 39867 Contractor selection plan posted in the last month
You did not use the site, Click here to remain logged. Timeout: 60 second