Construction of a route from the Military Sports Center of the Ministry of Defense to the Military Museum of Vietnam (including the bridge over the Nhue River)

Watching          
DauThau.info discovered that this project's data collected from the new National Bidding Network System has differences in the investor compared to the data on the old system as follows:
 ⚬ New system: Ban quản lý dự án đầu tư xây dựng quận Nam Từ Liêm
 ⚬ Old system: UBND quận Nam Từ Liêm
In addition, the bidding information related to this project also has discrepancies regarding the investor, specifically:
- The following contractor selection plans have the investor :
 ⚬ Construction of a route from the Military Sports Center of the Ministry of Defense to the Military Museum of Vietnam (including the bridge over the Nhue River)

- The following contractor selection plans have the investor :
 ⚬ Plan for selection of contractors in the pre-investment stage

- The following bidding packages have the investor Ban quản lý dự án đầu tư xây dựng quận Nam Từ Liêm:
 ⚬ Package 02: Consulting on determining the red line demarcation, introducing the HTKT's alignment

 ⚬ Package 04: Consulting for making environmental impact assessment reports.

 ⚬ Bidding package No. 09: Consulting on appraisal of environmental documents, results of selection of topographic survey contractor (vertical and horizontal measurements), geological survey and preparation of feasibility study report

 ⚬ Bidding package No. 08: Consulting on preparation of bidding documents, evaluation of bidding documents for topographic survey (vertical and horizontal measurements), geological survey and preparation of feasibility study report

 ⚬ Package No. 01: Surveying, surveying, mapping the current situation 1/500

 ⚬ Package No. 03: Consulting on Topographic Survey (Vertical and Horizontal Measurements) and geological survey for the preparation of Feasibility Study Report, Preparation of Feasibility Study Report

- The following bidding packages have the investor Ban quản lý dự án đầu tư xây dựng quận Nam Từ Liêm:
 ⚬ Package No. 15: Consulting and supervision of package No. 14

 ⚬ Package 14: Construction and equipment installation
Click để xem đầy đủClick để thu gọn
Found: 14:11 19/01/2021
Project number
20180830860-00
Notice type
Real announcement
Project name
Construction of a route from the Military Sports Center of the Ministry of Defense to the Military Museum of Vietnam (including the bridge over the Nhue River)
Investor ID
vnz000013389
Project Category
Group B
Project management Type
Another form
Use of ODA funds
No
Investment Total Value
To view full information please Login or Register VNĐ
Amount in text format
Project approval ID
291/HĐND-KTNS
Project approval date
31/05/2018

Contractor selection plans for this project

NO Contractor selection plan ID Contractor selection plan name Total investment
1
227.793.000.000 VND
2
227.793.000.000 VND
Total amount
455.586.000.000 VND

Statistical table of bidding packages under the project

Statistics by type of bidding package Statistics by form Online bidding value (billion VND) Number of bidding packages whose results have been posted
Goods Civil Works Consulting Other categories Non-Consulting Online Offline
0 1 1 0 0 2 9 70.96 8
You did not use the site, Click here to remain logged. Timeout: 60 second