Furnishing the hall and the production operator of Ha Tinh Power Company

Watching          
DauThau.info discovered that this project's data collected from the new National Bidding Network System has differences in the investor compared to the data on the old system as follows:
 ⚬ New system: EVN NPC PCHT
 ⚬ Old system: Công ty Điện lực Hà Tĩnh - Tổng công ty Điện lực Miền Bắc
In addition, the bidding information related to this project also has discrepancies regarding the investor, specifically:
- The following contractor selection plans have the investor Vietnam Sweden Hospital, Uongbi:
 ⚬ Procurement of pacemakers for cardiovascular interventions in 2022

- The following contractor selection plans have the investor :
 ⚬ Buy furniture and teaching equipment for primary school in Vinh Hao commune, Vu Ban district, Nam Dinh province

- The following contractor selection plans have the investor :
 ⚬ Highway 6 West – House 8 Male, Huy Het hamlet

- The following contractor selection plans have the investor Công ty Thủy điện Buôn Kuốp Chi nhánh Tổng Công ty phát điện 3 Công ty cổ phần:
 ⚬ Regarding the approval of the contractor selection plan for non-consulting service packages (phase 2) for production and business activities in 2022

- The following bidding packages have the investor Vietnam Sweden Hospital, Uongbi:
 ⚬ Package 1: Provide 01 chamber pacemaker set

 ⚬ Package 2: Provide 2-chamber pacemaker set

 ⚬ Package 3: Provides a 2-chamber pacemaker with features to reduce ventricular pacing and manage atrial fibrillation

 ⚬ Package 4: Provide automatic defibrillation machine

- The following bidding packages have the investor Công ty Thủy điện Buôn Kuốp Chi nhánh Tổng Công ty phát điện 3 Công ty cổ phần:
 ⚬ Fire and explosion insurance for warehouses of materials, equipment and property in the area to be managed and operated in 2022-2023

 ⚬ Monitoring and preparing reports on working environment monitoring 03 Buon Kuop, Buon Tua Srah, Srepok 3 power plants and the Company's office area in Mai Xuan Thuong in 2022

 ⚬ Inspecting equipment with strict requirements on OSH in 2022

 ⚬ Occupational safety and health training in 2022

- The following bidding packages have the investor EVN NPC PCHT:
 ⚬ Package No. 1: Consultancy on preparation of feasibility study report

 ⚬ Package 4: Supply of materials, equipment and construction and installation

 ⚬ Package No. 6: Supervision consultancy

 ⚬ Package 5: Project management consulting

 ⚬ Package No. 7: Construction Insurance

 ⚬ Package No. 2: Consulting on setting up construction drawing design - cost estimate

- The following bidding packages have the investor CÔNG TY TNHH MỘT THÀNH VIÊN XÂY DỰNG NGUYÊN KHANG BẠC LIÊU:
 ⚬ Construction
Click để xem đầy đủClick để thu gọn
Found: 20:30 19/01/2021
Project number
20200343271-00
Notice type
Real announcement
Project name
Furnishing the hall and the production operator of Ha Tinh Power Company
Investor
Investor ID
vnz000012866
Project Category
Group C
Project management Type
Another form
Use of ODA funds
No
Investment Total Value
To view full information please Login or Register VNĐ
Amount in text format
Project approval ID
2371/QĐ-EVNNPC ngày 05/8/2016
Project approval date
05/08/2016

Contractor selection plans for this project

NO Contractor selection plan ID Contractor selection plan name Total investment
1
23.210.000.000 VND
2
3.325.000.000 VND
3
373.185.000 VND
4
2.850.997.000 VND
5
537.864.512 VND
6
23.210.000.000 VND
7
23.210.000.000 VND
Total amount
76.717.046.512 VND

Statistical table of bidding packages under the project

Statistics by type of bidding package Statistics by form Online bidding value (billion VND) Number of bidding packages whose results have been posted
Goods Civil Works Consulting Other categories Non-Consulting Online Offline
0 0 0 0 0 0 18 0.00 15
You did not use the site, Click here to remain logged. Timeout: 60 second