Headquarters of Nghe An Department of Finance in Hung Phuc ward, Vinh city

Watching          
DauThau.info discovered that this project's data collected from the new National Bidding Network System has differences in the investor compared to the data on the old system as follows:
 ⚬ New system: Công ty Cổ phần Tư vấn Xây dựng Tân Hưng Phúc
 ⚬ Old system: Sở Tài chính Nghệ An
In addition, the bidding information related to this project also has discrepancies regarding the investor, specifically:
- The following contractor selection plans have the investor Sở Tài chính tỉnh Nghệ An:
 ⚬ The plan to select the contractor for the second phase of the project: Building the office of the Nghe An Department of Finance in Hung Phuc ward, Vinh city

- The following bidding packages have the investor Công ty Cổ phần Tư vấn Xây dựng Tân Hưng Phúc:
 ⚬ Package 13: Construction of fire protection system and stair pressure booster

 ⚬ Package 15: Construction and installation of interior equipment and light electrical systems (Conference room acoustics, online meeting room audio furniture, office furniture and equipment, computer systems) dedicated features, surveillance camera system, public sound system; telephone network system)

 ⚬ Package 16: Technical infrastructure (ground leveling, road yard, security house, fence gate, water supply and drainage outside the house, generator house, low voltage line and lighting)

 ⚬ Package 14: Construction and installation of ventilation and air conditioning systems, elevators and electrical equipment in the house

 ⚬ Package 17: Substation and medium voltage line
Click để xem đầy đủClick để thu gọn
Found: 23:40 19/01/2021
Project number
20201250960-00
Notice type
Real announcement
Project name
Headquarters of Nghe An Department of Finance in Hung Phuc ward, Vinh city
Investor ID
vn2901789305
Project Category
Group B
Project management Type
Another form
Use of ODA funds
No
Investment Total Value
To view full information please Login or Register VNĐ
Amount in text format
Project approval ID
207/QĐ-UBND
Project approval date
23/11/2019

Contractor selection plans for this project

NO Contractor selection plan ID Contractor selection plan name Total investment
1
100.674.194.000 VND
Total amount
100.674.194.000 VND

Statistical table of bidding packages under the project

Statistics by type of bidding package Statistics by form Online bidding value (billion VND) Number of bidding packages whose results have been posted
Goods Civil Works Consulting Other categories Non-Consulting Online Offline
0 0 0 0 0 0 13 0.00 5
Greeting
Greeting,
You are not logged in, please log in to use our various functions for members.

You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!

If you are still not our member, please sign up.

Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.

Search for bid information
Click for advanced search
Statistical
  • 8550 Projects are waiting for contractors
  • 418 Tender notices posted in the last 24 hours
  • 431 Contractor selection plan posted in the last 24 hours
  • 24860 Tender notices posted in the past month
  • 38641 Contractor selection plan posted in the last month
You did not use the site, Click here to remain logged. Timeout: 60 second