DauThau.info discovered that this project's data collected from the new National Bidding Network System has differences in the investor compared to the data on the old system as follows:
⚬ New system: Ban Quản lý Khu kinh tế Đồng Tháp
⚬ Old system: Ban Quản lý Khu kinh tế Đồng Tháp
In addition, the bidding information related to this project also has discrepancies regarding the investor, specifically:
- The following contractor selection plans have the investor Ban quản lý Khu kinh tế Đồng Tháp:
⚬ Component 1 of the infrastructure project of Tan Kieu Industrial Park, Thap Muoi district, Dong Thap province
⚬ Project Component 1 of the infrastructure project of Tan Kieu Industrial Park, Thap Muoi district, Dong Thap province
- The following contractor selection plans have the investor Ban Quản lý dự án đầu tư xây dựng công trinh dân dụng và công nghiệp tỉnh Đồng Tháp:
⚬ Adjustment of contractor selection plan for package No. 06 project Component 1 of the infrastructure project of Tan Kieu Industrial Park, Thap Muoi district, Dong Thap province
- The following bidding packages have the investor Ban Quản lý dự án đầu tư xây dựng công trinh dân dụng và công nghiệp tỉnh Đồng Tháp:
⚬ Package 6: Construction of the DT846 collection road, including: Traffic system (including sidewalks), rainwater drainage system, lighting system and trees-grass beds
⚬ Package No. 7: Construction of Centralized Wastewater Treatment Plant phase 1, including: Module 1 with capacity of 1500m3/day.night, 01 automatic monitoring station and Operating House (60m2)
- The following bidding packages have the investor :
⚬ Package No. 1: Consulting for making construction drawing design documents, project construction cost estimates Component 1
⚬ Package 5: Construction of N2 collection road, including: Traffic system (including sidewalks), Rainwater drainage system, Lighting system, Trees and lawns and Sewage drainage pipeline physical
Contractor selection plans for this project
NO | Contractor selection plan ID | Contractor selection plan name | Total investment |
---|---|---|---|
1
|
1.266.174.871.000 VND VND |
||
2
|
1.266.174.871.000 VND |
||
3
|
1.266.174.871.000 VND VND |
||
Total amount |
3.798.524.613.000 VND VND |
Statistical table of bidding packages under the project
Statistics by type of bidding package | Statistics by form | Online bidding value (billion VND) | Number of bidding packages whose results have been posted | |||||
---|---|---|---|---|---|---|---|---|
Goods | Civil Works | Consulting | Other categories | Non-Consulting | Online | Offline | ||
0 | 1 | 0 | 0 | 0 | 1 | 9 | 34.17 | 5 |