Invest in construction of Ca Mau Province Tuberculosis and Lung Disease Hospital

Watching          
DauThau.info discovered that this project's data collected from the new National Bidding Network System has differences in the investor compared to the data on the old system as follows:
 ⚬ New system: Ban QLDA công trình Xây dựng tỉnh Cà Mau
 ⚬ Old system: Ban QLDA công trình Xây dựng tỉnh Cà Mau
In addition, the bidding information related to this project also has discrepancies regarding the investor, specifically:
- The following contractor selection plans have the investor Ban QLDA công trình Xây dựng tỉnh Cà Mau:
 ⚬ Invest in construction of Ca Mau Province Tuberculosis and Lung Disease Hospital

- The following bidding packages have the investor Ban QLDA công trình Xây dựng tỉnh Cà Mau:
 ⚬ Ground filling; fence gate, guard house

 ⚬ Package No. 16: Administration office; Faculty of Pharmacy, materials and medical equipment; Nutritional department; Anti-infection scientist; Garage for medical staff and doctors; General house; Ambulance garage; House. Garbage storage; medical gas storage

 ⚬ Design construction drawings - estimate all items of the Project

 ⚬ Package No. 18: Bridge Corridor; Traffic, sidewalks

 ⚬ Package 12: Medical examination and emergency department - subclinical scientist; pulmonology inpatient block; TB inpatient - infectious scientist

 ⚬ Package No. 15: Medical gas system, Plus sound system; Communication systems, computer networks; Ventilation air conditioning system

 ⚬ Package 17: Fire protection system, lightning protection, automatic fire alarm

 ⚬ Package No. 20: Medical equipment (Phase 1)

 ⚬ Package No. 21: Medical equipment (phase 2)

 ⚬ Package 14: Power supply system, outdoor lighting; Generator house

 ⚬ Package 13: Water supply and drainage system for the whole area; Pumping station house + Underground water tank; Sewage drainage system, wastewater treatment pond (Including equipment)

 ⚬ Package No. 22: Elevator for medical examination house

 ⚬ Package No. 24: Garden, green campus

 ⚬ Package No. 19: Administrative equipment

 ⚬ Package 23: Generator 500KVA

 ⚬ Evaluation of bidding documents and results of contractor selection for construction drawing design bidding package - cost estimate of all items

 ⚬ Bidding package No. 26: Estimating equipment procurement packages (divided by equipment bidding packages)

 ⚬ Package 07: Supervision of equipment installation (divided according to each equipment procurement package)

 ⚬ Package No. 29: Construction supervision of works Package No. 15: Medical gas system, public sound system; Communication systems, computer networks; Air conditioning system, ventilation
Click để xem đầy đủClick để thu gọn
Found: 14:11 19/01/2021
Project number
20180831914-00
Notice type
Real announcement
Project name
Invest in construction of Ca Mau Province Tuberculosis and Lung Disease Hospital
Investor ID
vn2000477798
Project Category
Group B
Project management Type
Another form
Use of ODA funds
No
Investment Total Value
To view full information please Login or Register VNĐ
Amount in text format
Project approval ID
1812/QĐ-UBND
Project approval date
30/10/2017

Contractor selection plans for this project

NO Contractor selection plan ID Contractor selection plan name Total investment
1
135.953.139.000 VND
Total amount
135.953.139.000 VND

Statistical table of bidding packages under the project

Statistics by type of bidding package Statistics by form Online bidding value (billion VND) Number of bidding packages whose results have been posted
Goods Civil Works Consulting Other categories Non-Consulting Online Offline
0 0 0 0 0 0 31 0.00 19
Greeting
Greeting,
You are not logged in, please log in to use our various functions for members.

You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!

If you are still not our member, please sign up.

Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.

Search for bid information
Click for advanced search
Statistical
  • 8493 Projects are waiting for contractors
  • 170 Tender notices posted in the last 24 hours
  • 179 Contractor selection plan posted in the last 24 hours
  • 23810 Tender notices posted in the past month
  • 37249 Contractor selection plan posted in the last month
You did not use the site, Click here to remain logged. Timeout: 60 second