Investment project to upgrade and expand the road to the center of Hang Vinh commune (the section of the roundabout intersection to Vam Xang Cai Ngai)

Watching          
DauThau.info discovered that this project's data collected from the new National Bidding Network System has differences in the investor compared to the data on the old system as follows:
 ⚬ New system: Ban quản lý dự án xây dựng công trình giao thông Cà Mau
 ⚬ Old system: Ban quản lý dự án xây dựng công trình giao thông Cà Mau
In addition, the bidding information related to this project also has discrepancies regarding the investor, specifically:
- The following contractor selection plans have the investor Ban quản lý dự án xây dựng công trình giao thông Cà Mau:
 ⚬ Plan to select contractor for investment project to upgrade and expand the road to the center of Hang Vinh commune (the section of the Roundabout intersection to Vam Xang Cai Ngai)

 ⚬ 5th additional contractor selection plan for Investment Project to upgrade and expand the road to the center of Hang Vinh commune (section from Roundabout intersection to Vam Xang Cai Ngan)

 ⚬ The 4th revised and supplemented contractor selection plan for the investment project to upgrade and expand the road to the center of Hang Vinh commune (the section from the roundabout intersection to Vam Xang Cai Ngai)

- The following bidding packages have the investor Ban quản lý dự án xây dựng công trình giao thông Cà Mau:
 ⚬ Package 03: Making feasibility study report for construction work

 ⚬ Package 6: Evaluation of bidding documents and evaluation of LCNT results for package 02: Topographical survey, construction drawing design – construction cost estimate for section 1 (from Roundabout - Kenh Xang) and section 3 (bypass and Regiment Bridge)

 ⚬ Package 5: Preparation of Bid Documents and Bid Evaluation for Package 02: Topographical survey, construction drawing design – construction cost estimate for section 1 (from Roundabout - Kenh Xang) and section 3 (bypass and Regiment Bridge)

 ⚬ Package No. 13: Survey to prepare construction technical plan and estimate for demining, mines and explosives

 ⚬ Package 18: Producing site clearance piles and planting site clearance landmarks

 ⚬ Package No. 01: Topographic survey and preparation of construction feasibility study report

 ⚬ Bidding package No. 01: Supervise the survey work for the preparation of the financial plan (for the entire project)

 ⚬ Package No. 04: Supervise the survey work and prepare the Feasibility Study Report

 ⚬ Package 02: Geological survey step of preparation of feasibility study report for construction work

 ⚬ Bidding Package No. 25: Prepare Bid Documents and Evaluate Bid for Package No. 30.31

 ⚬ Bidding package No. 26: Evaluation of bidding documents and evaluation of LCNT results for package No. 30.31

 ⚬ Package 19: Surveying cadastral maps, making cadastral documents for site clearance work

 ⚬ Package 17: Construction of clearing bombs, mines and explosives

 ⚬ Package 16: Acceptance of cadastral map surveying and preparation of cadastral documents for site clearance work

 ⚬ Package No. 9: Survey, prepare technical plan - item estimate: Relocating water supply system

 ⚬ Package 04: Verification of construction drawing design and construction cost estimate (for the whole project)

 ⚬ Package No. 38: Evaluation of bidding documents and evaluation of LCNT results for packages No. 23, 24

 ⚬ Bidding Package No. 37: Preparation of Bid Documents and Bid Evaluation for Packages No. 23, 24

 ⚬ Package No. 34: Construction and relocation of fiber optic cables

 ⚬ Package 33: Construction of water relocation for section 1 (from Roundabout - Kenh Xang) and section 3 (bypass and bridge of Regiment)

 ⚬ Package No. 32: Construction and relocation of electricity

 ⚬ Package 12: Design verification - construction drawings and cost estimates

 ⚬ Package 11: Survey, design - construction drawing and item estimate: Relocating fiber optic cable

 ⚬ Package 10: Design verification - construction drawings and cost estimates

 ⚬ Package No. 29: Supervision of construction and relocation of fiber optic cables

 ⚬ Package No. 28: Supervision of water relocation for section 1 (from Roundabout - Kenh Xang) and section 3 (bypass and regimental bridge)

 ⚬ Package 20: Topographic survey, construction drawing design – construction cost estimate for section 2 (remaining part)

 ⚬ Package No. 27: Supervision of electrical relocation construction

 ⚬ Package 03: Geological survey step of making construction drawing design – construction cost estimate (for the regiment bridge)

 ⚬ Package No. 08: Surveying, setting up a cost estimate - item cost estimate: Relocation of electricity

 ⚬ Bidding Package 41: Evaluation of Bidding Documents and LCNT results for Package 42, Package 43 and Package 44

 ⚬ Bidding Package No. 40: Preparation of Bid Documents and Bid Evaluation for Bidding Package No. 42, Bidding Package No. 43 and Bidding Package No. 44

 ⚬ Package 44: Construction of the section from Cai Trang bridge to Vam Xang Cai Ngai

 ⚬ Package 43: Construction of the section from Kenh Xang bridge to Cai Trang bridge

 ⚬ Package 39: Audit of investment capital for the whole project

 ⚬ Package No. 45: Construction Insurance for Package No. 43

 ⚬ Package 42: Construction supervision for packages 43 and 44

 ⚬ Package No. 46: Construction Insurance for Package No. 44

 ⚬ Package No. 48: Construction and relocation of water supply system (part 2)

 ⚬ Package No. 47: Supervision of water supply system relocation (paragraph 2)
Click để xem đầy đủClick để thu gọn
Found: 23:41 19/01/2021
Project number
20201257483-00
Notice type
Real announcement
Project name
Investment project to upgrade and expand the road to the center of Hang Vinh commune (the section of the roundabout intersection to Vam Xang Cai Ngai)
Investor ID
vn2001138364
Project Category
Group B
Project management Type
Another form
Use of ODA funds
No
Investment Total Value
To view full information please Login or Register VNĐ
Amount in text format
Project approval ID
2280/QĐ-UBND ngày 27/11/2020
Project approval date
27/11/2020

Contractor selection plans for this project

NO Contractor selection plan ID Contractor selection plan name Total investment
1
101.420.070.000 VND
2
101.420.070.000 VND
3
101.420.070.000 VND
Total amount
304.260.210.000 VND

Statistical table of bidding packages under the project

Statistics by type of bidding package Statistics by form Online bidding value (billion VND) Number of bidding packages whose results have been posted
Goods Civil Works Consulting Other categories Non-Consulting Online Offline
0 3 4 0 3 3 50 32.08 43
Greeting
Greeting,
You are not logged in, please log in to use our various functions for members.

You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!

If you are still not our member, please sign up.

Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.

Search for bid information
Click for advanced search
Statistical
  • 8361 Projects are waiting for contractors
  • 1157 Tender notices posted in the last 24 hours
  • 1869 Contractor selection plan posted in the last 24 hours
  • 24376 Tender notices posted in the past month
  • 38634 Contractor selection plan posted in the last month
You did not use the site, Click here to remain logged. Timeout: 60 second