Pham Van Dong inner city road (section from Tam Giang bridge to the fork in the south of town)

Watching          
Found: 07:23 28/10/2024
Project number
PR2200009040-00
Notice type
Real announcement
Project name
Pham Van Dong inner city road (section from Tam Giang bridge to the fork in the south of town)
Project objective
Ensure smooth traffic, traffic safety, meet people's travel needs, synchronously connect the entire route according to the approved planning and a number of projects that have been and are being implemented; creating urban landscapes, gradually perfecting the technical infrastructure system, contributing to fulfilling the criteria for building Song Cau town into a city before 2025.
Investor ID
vn4400647991
Authority
Chairman of Song Cau Town People's Committee
Project duration
5 Year
Project Category
Group B
Project management Type
The investor directly manages the project
Use of ODA funds
No
Investment Total Value
To view full information please Login or Register VNĐ
Amount in text format
Project approval ID
3556/QĐ-UBND
Project approval date
05/11/2021
Approval authority
UBND thị xã Sông Cầu
Approval documents

Downloading files directly on the new Public Procurement System requires a computer using the Windows operating system and needs to install Client Agent software (Linux and MacOS cannot download Client software yet). ). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use our DauThau.info.
Our system will help you download files faster, on any device without installing Client Agent.To download, please Login or Register

QĐ 3556 phê duyệt báo cáo nghiên cứu khả thi đầu tư đường nội thị Pham Văn Đồng.pdf
File can only be downloaded on Windows computers using Agent, please see instructions here!!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611

Contractor selection plans for this project

NO Contractor selection plan ID Contractor selection plan name Total investment
1
159.998.676.898 VND
Total amount
159.998.676.898 VND

Statistical table of bidding packages under the project

Statistics by type of bidding package Statistics by form Online bidding value (billion VND) Number of bidding packages whose results have been posted
Goods Civil Works Consulting Other categories Non-Consulting Online Offline
0 1 3 0 1 2 3 68.86 2
Greeting
Greeting,
You are not logged in, please log in to use our various functions for members.

You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!

If you are still not our member, please sign up.

Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.

Search for bid information
Click for advanced search
Statistical
  • 8533 Projects are waiting for contractors
  • 144 Tender notices posted in the last 24 hours
  • 155 Contractor selection plan posted in the last 24 hours
  • 23681 Tender notices posted in the past month
  • 37138 Contractor selection plan posted in the last month
You did not use the site, Click here to remain logged. Timeout: 60 second