DauThau.info discovered that this project's data collected from the new National Bidding Network System has differences in the investor compared to the data on the old system as follows:
⚬ New system: Ban Quản lý dự án đầu tư xây dựng thành phố Móng Cái
⚬ Old system: Ban Quản lý dự án đầu tư xây dựng thành phố Móng Cái
In addition, the bidding information related to this project also has discrepancies regarding the investor, specifically:
- The following contractor selection plans have the investor Ban quản lý dự án đầu tư xây dựng thành phố Móng Cái:
⚬ Urban planning to implement the project: Residential land infrastructure for resettlement in Thuong Trung area, Ninh Duong ward, Mong Cai city
⚬ KHLCNT prepares a plan to move the 22Kv transmission line for site clearance and construction of the resettlement residential land infrastructure project in Thuong Trung area, Ninh Duong ward, Mong Cai city
⚬ The plan is to implement the following items: Moving the 22Kv transmission line to serve the site clearance and construction of the resettlement residential land infrastructure project in Thuong Trung area, Ninh Duong ward.
⚬ KHLCNT advises on designing and estimating items: Return of works serving site clearance for project implementation Residential land infrastructure for resettlement in Thuong Trung area, Ninh Duong ward, Mong Cai city
⚬ Construction planning: Relocating the household transformer station Mr. Trinh Tuan Anh - Ms. Nguyen Thuy Hoan to serve the site clearance and construction of the resettlement residential land infrastructure project in Thuong Trung area, Ninh Duong ward, Mong Cai city
- The following bidding packages have the investor Ban quản lý dự án đầu tư xây dựng thành phố Móng Cái:
⚬ Construction + construction equipment Residential land for resettlement in Thuong Trung area, Ninh Duong ward, Mong Cai city
⚬ Construction and installation of items: Moving the 22Kv line to serve the site clearance and construction of the resettlement residential land infrastructure project in Thuong Trung area, Ninh Duong ward,
⚬ Package 3: Supervision of the relocation of 22Kv transmission lines to serve the site clearance and construction of the resettlement residential land infrastructure project in Thuong Trung area, Ninh Duong ward,
⚬ Package 1: Consulting for E-Billing and Evaluation of E-Bid for the item Moving the 22Kv line to serve the site clearance and construction of the resettlement residential land infrastructure project in Thuong Trung area, Ninh Duong ward.
⚬ moving 22Kv line for site clearance and construction of resettlement residential land infrastructure project in Thuong Trung area, Ninh Duong ward, Mong Cai city
⚬ Tender package to move the substation
⚬ Bidding package - consulting for designing and estimating items: Return of works serving site clearance for project implementation Residential land infrastructure for resettlement in Thuong Trung area, Ninh Duong ward, Mong Cai city
Contractor selection plans for this project
NO | Contractor selection plan ID | Contractor selection plan name | Total investment |
---|---|---|---|
1
|
193.180.000.000 VND |
||
2
|
193.180.000.000 VND VND |
||
3
|
193.180.000.000 VND VND |
||
4
|
193.180.000.000 VND |
||
5
|
193.180.000.000 VND |
||
Total amount |
965.900.000.000 VND |
Statistical table of bidding packages under the project
Statistics by type of bidding package | Statistics by form | Online bidding value (billion VND) | Number of bidding packages whose results have been posted | |||||
---|---|---|---|---|---|---|---|---|
Goods | Civil Works | Consulting | Other categories | Non-Consulting | Online | Offline | ||
0 | 1 | 2 | 0 | 0 | 1 | 6 | 0.60 | 7 |