DauThau.info discovered that this project's data collected from the new National Bidding Network System has differences in the investor compared to the data on the old system as follows:
⚬ New system: Ban QLDA ĐTXD huyện Sìn Hồ
⚬ Old system: Ban QLDA ĐTXD huyện Sìn Hồ
In addition, the bidding information related to this project also has discrepancies regarding the investor, specifically:
- The following contractor selection plans have the investor :
⚬ Project contractor selection plan: Road from Hong Thu Hang Liea village to Tia Chi Lu village, Tua Sin Chai commune, Sin Ho district
- The following contractor selection plans have the investor Ban Quản lý Dự án đầu tư xây dựng huyện Sìn Hồ tỉnh Lai Châu:
⚬ Road from Hong Thu Hang Liea village to Tia Chi Lu village, Tua Sin Chai commune, Sin Ho district
- The following bidding packages have the investor Ban Quản lý Dự án đầu tư xây dựng huyện Sìn Hồ tỉnh Lai Châu:
⚬ Package 02: (Consultation for survey, preparation of feasibility study report)
⚬ Package No. 01: (Supervising the survey work at the preparation stage of the F/S report)
- The following bidding packages have the investor Ban Quản lý Dự án đầu tư xây dựng huyện Sìn Hồ tỉnh Lai Châu:
⚬ Package No. 05 (Cost of design verification - estimate) works: Road from Hong Thu Hang Liea village to Tia Chi Lu village, Tua Sin Chai commune, Sin Ho district
⚬ Package 07 (Cost for preparation of bids, evaluation of construction bids) works: Road from Hong Thu Hang Liea village to Tia Chi Lu village, Tua Sin Chai commune, Sin Ho district
⚬ Package No. 09 (Work quality inspection cost) works: Road from Hong Thu Hang Liea village to Tia Chi Lu village, Tua Sin Chai commune, Sin Ho district
⚬ Package No. 10 (Construction and installation of the whole project) works: Road from Hong Thu Hang Lie village to Tia Chi Lu village, Tua Sin Chai commune, Sin Ho district
⚬ Package 06 (Construction supervision cost) works: Road from Hong Thu Hang Liea village to Tia Chi Lu village, Tua Sin Chai commune, Sin Ho district
Contractor selection plans for this project
NO | Contractor selection plan ID | Contractor selection plan name | Total investment |
---|---|---|---|
1
|
34.500.000.000 VND |
||
2
|
1.497.627.854 VND |
||
Total amount |
35.997.627.854 VND |
Statistical table of bidding packages under the project
Statistics by type of bidding package | Statistics by form | Online bidding value (billion VND) | Number of bidding packages whose results have been posted | |||||
---|---|---|---|---|---|---|---|---|
Goods | Civil Works | Consulting | Other categories | Non-Consulting | Online | Offline | ||
0 | 1 | 5 | 0 | 0 | 2 | 6 | 28.73 | 7 |