DauThau.info discovered that this project's data collected from the new National Bidding Network System has differences in the investor compared to the data on the old system as follows:
⚬ New system: Ban quản lý dự án đầu tư xây dựng huyện Thanh Ba
⚬ Old system: Ủy ban nhân dân huyện Thanh Ba
In addition, the bidding information related to this project also has discrepancies regarding the investor, specifically:
- The following contractor selection plans have the investor Ban quản lý dự án đầu tư xây dựng huyện Thanh Ba:
⚬ The contractor selection plan in the construction investment preparation stage: The route connects from Km30 of Tuyen Quang - Phu Tho expressway to the center of Thanh Ba district
- The following bidding packages have the investor Ban quản lý dự án đầu tư xây dựng huyện Thanh Ba:
⚬ Package 02: Evaluation of Bidding Documents, LCNT results
⚬ Package No. 01: Preparation of Bid Documents, Bid Evaluation
⚬ Package 04: Survey, prepare feasibility study report
⚬ Package 03: Supervision of construction survey work
Contractor selection plans for this project
NO | Contractor selection plan ID | Contractor selection plan name | Total investment |
---|---|---|---|
1
|
1.686.091.000 VND |
||
Total amount |
1.686.091.000 VND |
Statistical table of bidding packages under the project
Statistics by type of bidding package | Statistics by form | Online bidding value (billion VND) | Number of bidding packages whose results have been posted | |||||
---|---|---|---|---|---|---|---|---|
Goods | Civil Works | Consulting | Other categories | Non-Consulting | Online | Offline | ||
0 | 0 | 0 | 0 | 0 | 0 | 5 | 0.00 | 5 |