Traffic trunk road connecting from National Highway 62 to the inter-district road Moc Hoa - Thanh Hoa

Watching          
DauThau.info discovered that this project's data collected from the new National Bidding Network System has differences in the investor compared to the data on the old system as follows:
 ⚬ New system: HUNG LONG CONSTRUCTION AND INVESTMENT JOINT STOCK COMPANY
 ⚬ Old system: Ban QLDA Đầu tư xây dựng huyện Mộc Hóa
In addition, the bidding information related to this project also has discrepancies regarding the investor, specifically:
- The following contractor selection plans have the investor Ban QLDA đầu tư xây dựng huyện Mộc Hóa:
 ⚬ Traffic trunk road connecting from National Highway 62 to the inter-district road Moc Hoa - Thanh Hoa

 ⚬ Traffic trunk road connecting from National Highway 62 to the inter-district road Moc Hoa - Thanh Hoa

- The following contractor selection plans have the investor Chi cục Thủy sản:
 ⚬ Buy regenerative stocked fingerlings and develop aquatic resources in 2022

- The following bidding packages have the investor Chi cục Thủy sản:
 ⚬ Consultancy on appraisal of tender documents and contractor selection

 ⚬ Consultancy on preparation and evaluation of tender documents

 ⚬ Buy regenerative stocked fingerlings and develop aquatic resources in 2022

- The following bidding packages have the investor HUNG LONG CONSTRUCTION AND INVESTMENT JOINT STOCK COMPANY:
 ⚬ Consultancy on surveying and setting up investment projects for construction works

 ⚬ Consulting survey, design construction drawings, cost estimates
Click để xem đầy đủClick để thu gọn
Found: 23:12 19/01/2021
Project number
20201121681-00
Notice type
Real announcement
Project name
Traffic trunk road connecting from National Highway 62 to the inter-district road Moc Hoa - Thanh Hoa
Investor ID
vn0309949629
Project Category
Group C
Project management Type
Another form
Use of ODA funds
No
Investment Total Value
To view full information please Login or Register VNĐ
Amount in text format
Project approval ID
2204/QĐ-UBND
Project approval date
30/10/2020

Contractor selection plans for this project

NO Contractor selection plan ID Contractor selection plan name Total investment
1
1.835.794.000 VND
2
340.000.000 VND
3
1.835.794.000 VND
Total amount
4.011.588.000 VND

Statistical table of bidding packages under the project

Statistics by type of bidding package Statistics by form Online bidding value (billion VND) Number of bidding packages whose results have been posted
Goods Civil Works Consulting Other categories Non-Consulting Online Offline
0 0 0 0 0 0 21 0.00 7
Greeting
Greeting,
You are not logged in, please log in to use our various functions for members.

You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!

If you are still not our member, please sign up.

Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.

Search for bid information
Click for advanced search
Statistical
  • 8339 Projects are waiting for contractors
  • 1145 Tender notices posted in the last 24 hours
  • 1865 Contractor selection plan posted in the last 24 hours
  • 24365 Tender notices posted in the past month
  • 38620 Contractor selection plan posted in the last month
You did not use the site, Click here to remain logged. Timeout: 60 second