Upgrading and expanding Krong Kmar water supply works (supplying domestic water for Hoa Son commune and 6 hamlets of Khue Ngoc Dien commune), Krong Bong district

Watching          
Project Overall procurement plan Contractor selection plan Tender Notice Bid opening result Contractor selection result
DauThau.info discovered that this project's data collected from the new National Bidding Network System has differences in the investor compared to the data on the old system as follows:
 ⚬ New system: Sở Nông nghiệp và PTNT Đắk Lắk
 ⚬ Old system: Sở Nông nghiệp và PTNT tỉnh Đắk Lắk
In addition, the bidding information related to this project also has discrepancies regarding the investor, specifically:
- The following contractor selection plans have the investor :
 ⚬ Project contractor selection plan: Upgrading and expanding Krong Kmar water supply works (supplying domestic water for Hoa Son commune and 6 Khue Ngoc Dien hamlets), Krong Bong district

 ⚬ Adjustment of the starting time of the contractor selection for the Project: Upgrading and expanding Krong Kmar water supply works (supplying domestic water for Hoa Son commune and 6 villages of Khue Ngoc Dien commune), Krong Bong district

 ⚬ Plan for contractor selection in the pre-investment (Additional) stage of the project: Domestic water supply in Binh Hoa commune, Krong Ana district, under the Program "Expansion of rural clean water and sanitation scale based on results based on results." "

- The following bidding packages have the investor Sở Nông nghiệp và PTNT Đắk Lắk:
 ⚬ Construction drawing design consultancy - cost estimate

 ⚬ Consultancy and verification of construction drawing design - cost estimate

 ⚬ Package 2: Construction, supply and installation of equipment (including items: Pipe network; Connecting households and equipment)

 ⚬ Package 1: Construction, supply and installation of equipment (including items: Leveling, Earth retaining wall; Settling tank - fast filtration; Slow filter tank; Storage tank; Technology pipelines and accessories Facilities; Operational Manager; Chemical house; Fence; Ground floor - valve pit - manhole.)

 ⚬ Construction insurance

 ⚬ Construction supervision consultancy and equipment supply and installation
Click để xem đầy đủClick để thu gọn
Found: 19:31 19/01/2021
Project number
20191239674-00
Notice type
Real announcement
Project name
Upgrading and expanding Krong Kmar water supply works (supplying domestic water for Hoa Son commune and 6 hamlets of Khue Ngoc Dien commune), Krong Bong district
Investor ID
vnz000004764
Project Category
Group C
Project management Type
Another form
Use of ODA funds
No
Investment Total Value
To view full information please Login or Register VNĐ
Amount in text format
Project approval ID
3196/QĐ-UBND ngày 31/10/2019
Project approval date
31/10/2019

Contractor selection plans for this project

NO Contractor selection plan ID Contractor selection plan name Total investment
1
28.000.000.000 VND
2
28.000.000.000 VND
3
28.000.000.000 VND
Total amount
84.000.000.000 VND

Statistical table of bidding packages under the project

Statistics by type of bidding package Statistics by form Online bidding value (billion VND) Number of bidding packages whose results have been posted
Goods Civil Works Consulting Other categories Non-Consulting Online Offline
0 0 0 0 0 0 20 0.00 6
Greeting
Greeting,
You are not logged in, please log in to use our various functions for members.

You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!

If you are still not our member, please sign up.

Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.

Search for bid information
Click for advanced search
Statistical
  • 7892 Projects are waiting for contractors
  • 528 Tender notices posted in the last 24 hours
  • 879 Contractor selection plan posted in the last 24 hours
  • 23863 Tender notices posted in the past month
  • 37720 Contractor selection plan posted in the last month
You did not use the site, Click here to remain logged. Timeout: 60 second