Upgrading branch roads and substations of Highway 971 TG Ria to 22kV operation; Upgrading and renovating highway 971 TG Ria; Upgrading TG Ria to 35/22kV and the 972 TG Ria highway to operate with voltage of 22kV; Renovating 371E23.5 road, changing the wire to 150 from measuring 84 to Yen Hoa TG

Watching          
DauThau.info discovered that this project's data collected from the new National Bidding Network System has differences in the investor compared to the data on the old system as follows:
 ⚬ New system: NINH BINH POWER COMPANY LIMITED
 ⚬ Old system: Công ty trách nhiệm hữu hạn một thành viên Điện lực Ninh Bình
In addition, the bidding information related to this project also has discrepancies regarding the investor, specifically:
- The following contractor selection plans have the investor Công ty trách nhiệm hữu hạn một thành viên Điện lực Ninh Bình:
 ⚬ Upgrading branch roads and substations of Highway 971 TG Ria to 22kV operation; Upgrading and renovating highway 971 TG Ria; Upgrading TG Ria to 35/22kV and the 972 TG Ria highway to operate with voltage of 22kV; Renovating 371E23.5 road, changing the wire to 150 from measuring 84 to Yen Hoa TG

- The following bidding packages have the investor :
 ⚬ Upgrading and renovating highway 971 TG Ria

 ⚬ Upgrading branch roads and substations of Highway 971 TG Ria to 22kV . operation

 ⚬ Upgrading TG Ria to 35 22kV and 972 TG Ria highway to operate with voltage of 22kV

 ⚬ Construction supervision consultancy and installation of materials and equipment

 ⚬ Procurement of materials and equipment

 ⚬ Renovating 371E23.5 road, changing the wire to 150 from measuring 84 to Yen Hoa TG

- The following bidding packages have the investor Electricity Limited Company Ninh Binh:
 ⚬ Connecting hotline

 ⚬ Experiment
Click để xem đầy đủClick để thu gọn
Found: 13:57 20/04/2021
Project number
20210450066-00
Notice type
Real announcement
Project name
Upgrading branch roads and substations of Highway 971 TG Ria to 22kV operation; Upgrading and renovating highway 971 TG Ria; Upgrading TG Ria to 35/22kV and the 972 TG Ria highway to operate with voltage of 22kV; Renovating 371E23.5 road, changing the wire to 150 from measuring 84 to Yen Hoa TG
Investor ID
vn2700277392
Project Category
Group C
Project management Type
Another form
Use of ODA funds
No
Investment Total Value
To view full information please Login or Register VNĐ
Amount in text format
Project approval ID
406, 407/QĐ-PCNB ngày 20/03/2021; 422, 423/QĐ-PCNB ngày 22/03/2021
Project approval date
22/03/2021

Contractor selection plans for this project

NO Contractor selection plan ID Contractor selection plan name Total investment
1
45.502.621.142 VND
Total amount
45.502.621.142 VND

Statistical table of bidding packages under the project

Statistics by type of bidding package Statistics by form Online bidding value (billion VND) Number of bidding packages whose results have been posted
Goods Civil Works Consulting Other categories Non-Consulting Online Offline
0 0 0 0 0 0 9 0.00 8
Greeting
Greeting,
You are not logged in, please log in to use our various functions for members.

You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!

If you are still not our member, please sign up.

Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.

Search for bid information
Click for advanced search
Statistical
  • 8355 Projects are waiting for contractors
  • 1157 Tender notices posted in the last 24 hours
  • 1865 Contractor selection plan posted in the last 24 hours
  • 24377 Tender notices posted in the past month
  • 38628 Contractor selection plan posted in the last month
You did not use the site, Click here to remain logged. Timeout: 60 second