Upgrading the canal system of Southern Ma River Pumping Station, Thanh Hoa province under the Irrigated Agriculture Improvement project funded by the World Bank (WB7)

Watching          
Project Overall procurement plan Contractor selection plan Tender Notice Bid opening result Contractor selection result
DauThau.info discovered that this project's data collected from the new National Bidding Network System has differences in the investor compared to the data on the old system as follows:
 ⚬ New system: Ban Quản lý dự án đầu tư xây dựng các công trình Nông nghiệp và Phát triển nông thôn Thanh Hóa
 ⚬ Old system: Sở Nông nghiệp và phát triển nông thôn Thanh Hóa
In addition, the bidding information related to this project also has discrepancies regarding the investor, specifically:
- The following contractor selection plans have the investor Sở Nông nghiệp và Phát triển nông thôn Thanh Hóa:
 ⚬ Approving adjustments and supplements to the contractor selection plan

 ⚬ Approving the adjustment and supplementation of the contractor selection plan (phase 2)

- The following bidding packages have the investor Ban Quản lý dự án đầu tư xây dựng các công trình Nông nghiệp và Phát triển nông thôn Thanh Hóa:
 ⚬ Tender package: Supply of office equipment for IMC; providing office equipment, water collection equipment, in-field water metering for organizations using water (symbol: TH/IMC-WUA/TB2/2018)

 ⚬ Package: Construction, renovation and upgrading of canals B22a, B26, B28 and B30-1 (Sign: TH/W9/KB-KCB/2018)

 ⚬ Tender package: Procurement of hand-held equipment/machine tools for CSA models (symbol TH/CSA/TB1/2018)

 ⚬ Package: Procurement of equipment for PPMU Thanh Hoa (symbol TH/PMU/TB1/2018)
Click để xem đầy đủClick để thu gọn
Found: 13:17 19/01/2021
Project number
20180603251-00
Notice type
Real announcement
Project name
Upgrading the canal system of Southern Ma River Pumping Station, Thanh Hoa province under the Irrigated Agriculture Improvement project funded by the World Bank (WB7)
Investor ID
vnz000007870
Project Category
Group B
Project management Type
Another form
Use of ODA funds
Yes
Investment Total Value
To view full information please Login or Register VNĐ
Amount in text format
Project approval ID
2869/QĐ-BNN-XD
Project approval date
09/12/2013

Contractor selection plans for this project

NO Contractor selection plan ID Contractor selection plan name Total investment
1
730.213.000.000 VND
2
730.213.000.000 VND
Total amount
1.460.426.000.000 VND

Statistical table of bidding packages under the project

Statistics by type of bidding package Statistics by form Online bidding value (billion VND) Number of bidding packages whose results have been posted
Goods Civil Works Consulting Other categories Non-Consulting Online Offline
0 0 0 0 0 0 7 0.00 4
Greeting
Greeting,
You are not logged in, please log in to use our various functions for members.

You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!

If you are still not our member, please sign up.

Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.

Search for bid information
Click for advanced search
Statistical
  • 8488 Projects are waiting for contractors
  • 368 Tender notices posted in the last 24 hours
  • 383 Contractor selection plan posted in the last 24 hours
  • 24755 Tender notices posted in the past month
  • 38430 Contractor selection plan posted in the last month
You did not use the site, Click here to remain logged. Timeout: 60 second