Building climate change adaptation infrastructure for ethnic minorities (CRIEM) - Quang Nam province component project
Project number
PR2300001802-00
Notice type
Real announcement
Project name
Building climate change adaptation infrastructure for ethnic minorities (CRIEM) - Quang Nam province component project
Project objective
According to the approved policy, the objective of the project is to improve opportunities for livelihood development, reduce poverty and inequality for ethnic minorities through the development of integrated infrastructure investment to adapt to change. climate.
Specific objectives: Upgrading transport infrastructure; improve infrastructure for production in order to support economic development for ethnic minorities; upgrade technology and disaster risk analysis system to support sustainable infrastructure development to adapt to climate change
Authority
People's Committee of Quang Nam Province
Project management Type
Specialized - regional PMUs
Implementation location (After merger)
Project approval ID
Quyết định số 328/QĐ-UBND của tỉnh Quảng Nam
Project approval date
29/01/2021
Approval authority
UBND tỉnh Quảng Nam
Approval documents
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register
01-210129_0328_QĐ phe duyệt du an Xay dung co so ha tang vung dong bao dan toc thieu so CRIEM.pdf
Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Contractor selection plans for this project
| NO |
Contractor selection plan ID |
Contractor selection plan name |
Total investment |
|
1
|
|
0 VND |
|
2
|
|
923.142.000.000 VND |
Total amount |
923.142.000.000 VND |
Statistical table of bidding packages under the project
| Statistics by type of bidding package |
Statistics by form |
Online bidding value (billion VND) |
Number of bidding packages whose results have been posted |
| Goods |
Civil Works |
Consulting |
Other categories |
Non-Consulting |
Online |
Offline |
| 0 |
3 |
5 |
0 |
0 |
4
|
4 |
156.01
|
5
|