Building steel stairs to check down the RCC dam - CTTĐ Ban Chat
Watching
Project
Overall procurement plan
Contractor selection plan
Project number
PR2500047688-00
Notice type
Real announcement
Project name
Building steel stairs to check down the RCC dam - CTTĐ Ban Chat
Project objective
Building a steel stairs system to serve the inspection and operation of Ban Chat hydroelectric project. Helps reduce the load of the existing dam elevator system of the factory when the elevator is incident
Project management Type
The investor directly manages the project
Implementation location
Xã Mường Kim, Lai Chau province
Project approval ID
1642/QĐ-HQBC
Project approval date
08/09/2025
Approval authority
Công ty Thủy điện Huội Quảng - Bản Chát
Approval documents
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register
3. QĐ-HQBC phê duyệt BCKTKT Thang thép.pdf
Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Contractor selection plans for this project
| NO |
Contractor selection plan ID |
Contractor selection plan name |
Total investment |
|
1
|
|
183.401.752 VND |
Total amount |
183.401.752 VND |