Chau Thanh 220kV substation (Hau Giang) and connection

Watching          
DauThau.info discovered that this project's data collected from the new National Bidding Network System has differences in the investor compared to the data on the old system as follows:
 ⚬ New system: SOUTHERN VIETNAM POWER PROJECTS MANAGEMENT BOARD
 ⚬ Old system: Tổng Công Truyền tải Điện Quốc Gia
In addition, the bidding information related to this project also has discrepancies regarding the investor, specifically:
- The following bidding packages have the investor SOUTHERN VIETNAM POWER PROJECT MANAGEMENT BOARD:
 ⚬ Package 5: Providing consulting services to verify technical design and construction cost estimate.

 ⚬ Package 3: Providing consulting services for construction survey, making technical design - construction cost estimate, construction drawing, bidding document.

 ⚬ Package 11: Surveying and setting up landmarks, measuring and drawing cadastral maps and consulting on compensation and site clearance.

 ⚬ Package No. 9: Construction and installation of the Station, including transporting the first VTTB to the site (excluding the installation of the transformer and the first + second part).

 ⚬ Package 12: Insurance of works during construction.

 ⚬ Package No. 7: Supply of VTTB of the first substation (including testing and sample approval) and conductors, lightning protection wires, insulated accessories, OPGW fiber optic cables and accessories for connection lines.

 ⚬ Package No. 19: Consulting and supervision of 220 kV-125 MVA transformer installation and supervision of the first + second calibration experiment (excluding SCADA law enforcement liability).

 ⚬ Package No. 10: Construction and installation of connection lines, including providing connection poles and transporting conductors, lightning protection wires, insulated accessories, OPGW fiber optic cables and accessories to the construction site.

 ⚬ Package 13: Transport of 220 kV-125 MVA transformer.
Click để xem đầy đủClick để thu gọn
Found: 15:46 19/01/2021
Project number
20190137459-00
Notice type
Real announcement
Project name
Chau Thanh 220kV substation (Hau Giang) and connection
Investor ID
vnz000022483
Project Category
Group B
Project management Type
Another form
Use of ODA funds
No
Investment Total Value
To view full information please Login or Register
Project approval ID
Số 2233/QĐ-EVNNPT
Project approval date
03/12/2018
Approval documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611

Contractor selection plans for this project

NO Contractor selection plan ID Contractor selection plan name Total investment
1
0 VND
Total amount
0 VND

Statistical table of bidding packages under the project

Statistics by type of bidding package Statistics by form Online bidding value (billion VND) Number of bidding packages whose results have been posted
Goods Civil Works Consulting Other categories Non-Consulting Online Offline
0 0 0 0 0 0 17 0.00 10