Coastal road project, section passing through Cua Tung and Cua Viet bridge areas

Watching          
Found: 16:52 12/08/2024
Project number
PR2400043975-00
Notice type
Real announcement
Project name
Coastal road project, section passing through Cua Tung and Cua Viet bridge areas
Project objective
- The investment in construction of the coastal road section passing through the Cua Tung and Cua Viet bridge areas in the districts of Vinh Linh, Gio Linh, Trieu Phong is extremely important, contributing to synchronous connection of the road. coastal with the East - West Economic Corridor, phase 1; Together with National Highway 1 and the North - South Expressway, it forms an inter-regional transport axis; connected to Dong Ha city - the political and cultural center of the province, a dynamic urban area on the East - West Economic Corridor...
Investor ID
vnz000024297
Authority
People's Committee of Quang Tri Province
Project duration
2 Year
Project Category
Group B
Project management Type
The investor directly manages the project
Use of ODA funds
No
Implementation location
Huyện Vĩnh Linh, Quảng Trị
Investment Total Value
To view full information please Login or Register
Project approval ID
810/QĐ-UBND
Project approval date
09/04/2024
Approval authority
UBND tỉnh Quảng Trị
Approval documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Project versions

Contractor selection plans for this project

NO Contractor selection plan ID Contractor selection plan name Total investment
1
3.038.819.000 VND
Total amount
3.038.819.000 VND

Statistical table of bidding packages under the project

Statistics by type of bidding package Statistics by form Online bidding value (billion VND) Number of bidding packages whose results have been posted
Goods Civil Works Consulting Other categories Non-Consulting Online Offline
0 0 5 0 0 1 4 2.35 5
You did not use the site, Click here to remain logged. Timeout: 60 second