Coastal road project, section passing through Cua Tung and Cua Viet bridge areas
Project number
PR2400043975-00
Notice type
Real announcement
Project name
Coastal road project, section passing through Cua Tung and Cua Viet bridge areas
Project objective
- The investment in construction of the coastal road section passing through the Cua Tung and Cua Viet bridge areas in the districts of Vinh Linh, Gio Linh, Trieu Phong is extremely important, contributing to synchronous connection of the road. coastal with the East - West Economic Corridor, phase 1; Together with National Highway 1 and the North - South Expressway, it forms an inter-regional transport axis; connected to Dong Ha city - the political and cultural center of the province, a dynamic urban area on the East - West Economic Corridor...
Authority
People's Committee of Quang Tri Province
Project management Type
The investor directly manages the project
Implementation location
Huyện Vĩnh Linh, Quảng Trị
Project approval ID
810/QĐ-UBND
Project approval date
09/04/2024
Approval authority
UBND tỉnh Quảng Trị
Approval documents
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register
2024.04.09 QĐ-810-UBND-Phê duyệt BCNCKT Dự án DVB2.pdf
Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Contractor selection plans for this project
| NO |
Contractor selection plan ID |
Contractor selection plan name |
Total investment |
|
1
|
|
3.038.819.000 VND |
Total amount |
3.038.819.000 VND |
Statistical table of bidding packages under the project
| Statistics by type of bidding package |
Statistics by form |
Online bidding value (billion VND) |
Number of bidding packages whose results have been posted |
| Goods |
Civil Works |
Consulting |
Other categories |
Non-Consulting |
Online |
Offline |
| 0 |
0 |
5 |
0 |
0 |
1
|
4 |
2.35
|
5
|