Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
DauThau.info discovered that this project's data collected from the new National Bidding Network System has differences in the investor compared to the data on the old system as follows:
⚬ New system: TAN HOA WATER SUPPLY JOINT STOCK COMPANY
⚬ Old system: Tổng Công ty Cấp nước Sài Gòn - TNHH Một thành viên
In addition, the bidding information related to this project also has discrepancies regarding the investor, specifically:
- The following contractor selection plans have the investor TAN HOA WATER SUPPLY JOINT STOCK COMPANY:
⚬ Completing the water supply network of Tan Binh District wards Phase 2
- The following bidding packages have the investor TAN HOA WATER SUPPLY JOINT STOCK COMPANY:
⚬ Consultancy on construction survey and preparation of economic and technical reports on construction works
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register
Contractor selection plans for this project
| NO | Contractor selection plan ID | Contractor selection plan name | Total investment |
|---|---|---|---|
|
1
|
3.346.208.000 VND |
||
Total amount |
3.346.208.000 VND |
||
Statistical table of bidding packages under the project
| Statistics by type of bidding package | Statistics by form | Online bidding value (billion VND) | Number of bidding packages whose results have been posted | |||||
|---|---|---|---|---|---|---|---|---|
| Goods | Civil Works | Consulting | Other categories | Non-Consulting | Online | Offline | ||
| 0 | 0 | 0 | 0 | 0 | 0 | 1 | 0.00 | 1 |