Component project 1.2: Compensation, support, resettlement and relocation of technical infrastructure for site clearance in Bac Tu Liem district (belonging to the investment project to build an underground tunnel on Hoang Quoc Viet street extending to Pham Van Dong street and connecting to Tran Vy street)
Watching
Project
Overall procurement plan
Contractor selection plan
Project number
PR2500060116-00
Notice type
Real announcement
Project name
Component project 1.2: Compensation, support, resettlement and relocation of technical infrastructure for site clearance in Bac Tu Liem district (belonging to the investment project to build an underground tunnel on Hoang Quoc Viet street extending to Pham Van Dong street and connecting to Tran Vy street)
Project objective
Compensation, support, resettlement and site clearance; Relocate and return technical infrastructure works within the scope of site clearance to invest in building an underground tunnel on Hoang Quoc Viet street extending to Pham Van Dong street and connecting to Tran Vy street in Bac Tu Liem district.
Authority
Hanoi People's Committee
Project management Type
The investor directly manages the project
Implementation location
Ha Noi city
Project approval ID
1966/QĐ-UBND
Project approval date
10/04/2025
Approval authority
UBND thành phố Hà Nội
Approval documents
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register
1. QĐ Phê duyệt chủ trương đầu tư.pdf
Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Contractor selection plans Link
The project does not have any NTFP yet