Cong Hoa 220kV transformer station and connection lines
Watching
Project
Overall procurement plan
Contractor selection plan
Project number
PR2500059897-00
Notice type
Real announcement
Project name
Cong Hoa 220kV transformer station and connection lines
Project objective
- Meet the load growth needs of the power system in Quang Ninh province; ensure electricity supply and buy electricity from China. Create strong links between areas in the power system, increasing the safe and stable operation of the national power system.
Reduce power loss in transmission grid, increase efficiency of electricity production and business;
Authority
General Director of Northern Power Corporation
Project management Type
The investor directly manages the project
Implementation location
Quang Ninh province
Project approval ID
236/QĐ-HĐTV
Project approval date
10/11/2025
Approval authority
TỔNG CÔNG TY ĐIỆN LỰC MIỀN BẮC
Approval documents
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register
Quyet dinh phê duyệt du an TBA 220kV Cong Hoa và ĐZ dau noi_IN (1).pdf
Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Contractor selection plans Link
The project does not have any NTFP yet