Construction investment in 2021 (phase 1) - My Duc Power Company

Watching          
DauThau.info discovered that this project's data collected from the new National Bidding Network System has differences in the investor compared to the data on the old system as follows:
 ⚬ New system: CÔNG TY ĐIỆN LỰC MỸ ĐỨC
 ⚬ Old system: Công ty Điện lực Mỹ Đức - Tổng Công ty Điện lực TP Hà Nội
In addition, the bidding information related to this project also has discrepancies regarding the investor, specifically:
- The following bidding packages have the investor Công ty Điện lực Mỹ Đức:
 ⚬ VTTB experiment 02 projects New construction of interconnected loop circuits of roads 478E10.2 and 474E10.2 Van Dinh and New construction of transformer stations in 2021

 ⚬ Supervision of construction and installation works Renovating and upgrading 478E10.2 Van Dinh transmission line from 110kV station to 55 pole

- The following bidding packages have the investor CÔNG TY ĐIỆN LỰC MỸ ĐỨC:
 ⚬ Supervising the construction and installation of 02 projects New construction of loop circuits connecting highways 478E10.2 and 474E10.2 Van Dinh and new construction of substations in 2021

 ⚬ Construction and installation of new construction of substations in 2021

 ⚬ Construction and installation of works New construction of loops connecting highways 478E10.2 and 474E10.2 Van Dinh

 ⚬ Construction and installation works Renovating and upgrading 478E10.2 Van Dinh transmission line from 110kV station to 55 pole

 ⚬ Procurement of equipment to serve the part-time Project Management Board in 2021

 ⚬ Procurement of materials and equipment for construction investment projects in 2021 (phase 1) - My Duc Power Company
Click để xem đầy đủClick để thu gọn
Found: 23:49 19/01/2021
Project number
20201292595-00
Notice type
Real announcement
Project name
Construction investment in 2021 (phase 1) - My Duc Power Company
Investor ID
vn0116001083
Project Category
Group C
Project management Type
Another form
Use of ODA funds
No
Investment Total Value
To view full information please Login or Register
Project approval ID
2797/QĐ-PCMYDUC
Project approval date
31/12/2020
Approval documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611

Contractor selection plans for this project

NO Contractor selection plan ID Contractor selection plan name Total investment
1
40.300.703.322 VND
2
40.300.703.322 VND
Total amount
80.601.406.644 VND

Statistical table of bidding packages under the project

Statistics by type of bidding package Statistics by form Online bidding value (billion VND) Number of bidding packages whose results have been posted
Goods Civil Works Consulting Other categories Non-Consulting Online Offline
0 0 0 0 0 0 13 0.00 9
You did not use the site, Click here to remain logged. Timeout: 60 second