Construction investment to increase static stability, including the replacement of long-standing support pillars on lines 471MH (from pillar T01 to pillar T150 and the Cambodian border), line 472MH (from pillar T01 to pillar T23 and the Moc Hoa – Rach May axis), line 474MH (North Hoá area), and line 477MH.
Watching
Project
Overall procurement plan
Contractor selection plan
Project number
PR2600059378-00
Notice type
Real announcement
Project name
Construction investment to increase static stability, including the replacement of long-standing support pillars on lines 471MH (from pillar T01 to pillar T150 and the Cambodian border), line 472MH (from pillar T01 to pillar T23 and the Moc Hoa – Rach May axis), line 474MH (North Hoá area), and line 477MH.
Project management Type
The investor directly manages the project
Project approval ID
929/QĐ-PCTN
Project approval date
26/03/2026
Approval authority
Công ty Điện lực Tây Ninh
Approval documents
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register
Quyet dinh phe duyet PAĐT 2027 Ctr nâng cao độ tĩnh không, thay trụ vận hành lâu năm tuyến 471, 472, 474, 477.pdf
Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Contractor selection plans Link
The project does not have any NTFP yet