Construction of Bon bridge on Provincial road 302
Project number
PR2300002268-00
Notice type
Real announcement
Project name
Construction of Bon bridge on Provincial road 302
Project objective
The project is invested to gradually improve transport infrastructure according to the Adjusted Plan for Transport Development of Vinh Phuc province to 2020, vision to 2030 and related construction plans, overcoming the situation Traffic congestion on Highway 302; improve the quality of traffic safety operations; Strengthening traffic connections for industrial parks in Binh Xuyen district, contributing to the socio-economic development of the province
Authority
Chairman of Vinh Phuc Provincial People's Committee
Project management Type
The investor directly manages the project
Implementation location
Huyện Bình Xuyên, Phú Thọ
Project approval ID
1595/QĐ-UBND
Project approval date
18/07/2023
Approval authority
UBND tỉnh Vĩnh Phúc
Approval documents
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register
Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Contractor selection plans for this project
| NO |
Contractor selection plan ID |
Contractor selection plan name |
Total investment |
|
1
|
|
457.562.000 VND |
|
2
|
|
37.170.000.000 VND |
Total amount |
37.627.562.000 VND |
Statistical table of bidding packages under the project
| Statistics by type of bidding package |
Statistics by form |
Online bidding value (billion VND) |
Number of bidding packages whose results have been posted |
| Goods |
Civil Works |
Consulting |
Other categories |
Non-Consulting |
Online |
Offline |
| 0 |
2 |
8 |
0 |
0 |
0
|
10 |
0.00
|
8
|