Contractor selection plan (project preparation stage) Package 01-26TVG.DTXD: Consulting on preparing construction investment and technical feasibility reports; under the following projects: Installation of medium voltage boundary measurement points after merger in the areas of Power Companies: Soc Son - Dong Anh; Install medium voltage switchgear with remote monitoring and control function on the power grid of Soc Son Power Company in 2026; Replace low voltage cabinets and install additional controlled capacitor banks at substations in Soc Son district (according to the old administrative geography) in 2026

Watching    
Project Overall procurement plan Contractor selection plan
Found: 16:25 10/11/2025
Project number
PR2500058423-00
Notice type
Real announcement
Project name
Contractor selection plan (project preparation stage) Package 01-26TVG.DTXD: Consulting on preparing construction investment and technical feasibility reports; under the following projects: Installation of medium voltage boundary measurement points after merger in the areas of Power Companies: Soc Son - Dong Anh; Install medium voltage switchgear with remote monitoring and control function on the power grid of Soc Son Power Company in 2026; Replace low voltage cabinets and install additional controlled capacitor banks at substations in Soc Son district (according to the old administrative geography) in 2026
Investor ID
vnz000019519
Authority
Mr. Nguyen Hoang Khuong
Project duration
12 Month
Project Category
Group C
Project management Type
The investor directly manages the project
Use of ODA funds
No
Implementation location
Ha Noi city
Investment Total Value
To view full information please Login or Register
Project approval ID
3149/QĐ-PCSOCSON
Project approval date
10/11/2025
Approval authority
Công ty Điện lực Sóc Sơn
Approval documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Project versions
Contractor selection plans Link
The project does not have any NTFP yet