Control control supervision system 35/6KV power supply system

Watching          
Found: 13:57 22/05/2025
Project number
PR2500031368-01
Notice type
Real announcement
Project name
Control control supervision system 35/6KV power supply system
Project objective
- Monitoring, centralized control, remote control of 35/6KV power supply systems and 6KV distribution stations on the ground and in the furnace, oriented to connect to the overall automation system of the whole mine to further improve the ability to supply electricity continuously for production, promptly notify technical staff to conduct maintenance and repair of equipment; - Monitor the leak network of all the transformer stations of the mine, automatically conduct leakage tests before each c
Investor ID
vnz000013700
Authority
Mr. Nguyen Van Hai - Director of Mao Khe Coal Company -TKV
Project duration
2 Year
Project Category
Group C
Project management Type
The investor directly manages the project
Use of ODA funds
No
Implementation location
Thành phố Đông Triều, Quang Ninh
Investment Total Value
To view full information please Login or Register
Project approval ID
1817/QĐ-TMK-ĐTM
Project approval date
29/04/2025
Approval authority
Chi nhánh Tập đoàn Công nghiệp Than - Khoáng sản Việt Nam - Công ty than Mạo Khê-TKV
Approval documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Project versions

Contractor selection plans for this project

NO Contractor selection plan ID Contractor selection plan name Total investment
1
17.087.335.768 VND
Total amount
17.087.335.768 VND

Statistical table of bidding packages under the project

Statistics by type of bidding package Statistics by form Online bidding value (billion VND) Number of bidding packages whose results have been posted
Goods Civil Works Consulting Other categories Non-Consulting Online Offline
1 0 2 0 0 1 2 16.75 3
You did not use the site, Click here to remain logged. Timeout: 60 second