Covering leachate reservoirs, Hoa Phu commune, Long Ho district

Watching          
Found: 09:58 14/02/2025
Project number
PR2500005727-00
Notice type
Real announcement
Project name
Covering leachate reservoirs, Hoa Phu commune, Long Ho district
Project objective
Protecting the banks of the land around the biological lake, reducing the risk of missing, overflowing with people affecting people who are cultivating agriculture around the centralized area and waste treatment, reducing the amount of leachate to be treated in biological lakes. Limit rainwater to penetrate the leachate reservoir. Ensuring the safety operation of biological lakes, long -term use, increasing durability for the surrounding soil, avoiding missing the banks, leaking garbage water causing pollution, affecting households in the area. Separate rainwater and leachate separately.
Investor ID
vn1500169888
Authority
Department of Planning and Investment of Vinh Long province
Project duration
3 Year
Project Category
Group C
Project management Type
The investor hired project management consultancy
Use of ODA funds
No
Implementation location
Huyện Long Hồ, ProvinceVĩnh Long
Investment Total Value
To view full information please Login or Register
Project approval ID
301a/QĐ-SKHĐT
Project approval date
10/12/2024
Approval authority
SỞ KẾ HOẠCH VÀ ĐẦU TƯ TỈNH VĨNH LONG
Approval documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611

Contractor selection plans for this project

NO Contractor selection plan ID Contractor selection plan name Total investment
1
2.909.461.638 VND
Total amount
2.909.461.638 VND

Statistical table of bidding packages under the project

Statistics by type of bidding package Statistics by form Online bidding value (billion VND) Number of bidding packages whose results have been posted
Goods Civil Works Consulting Other categories Non-Consulting Online Offline
0 1 7 0 1 1 8 2.73 7
You did not use the site, Click here to remain logged. Timeout: 60 second