Drainage canal from Mo Coi hamlet
Watching
Project
Overall procurement plan
Contractor selection plan
Project number
PR2600042833-00
Notice type
Real announcement
Project name
Drainage canal from Mo Coi hamlet
Project objective
In order to increase water drainage capacity for residential areas and fields in Truong Le during the rainy and flood season, improving the irrigation capacity of the system and saving project management costs is an extremely urgent need to serve the production needs of people in the area as well as renovate the Ward's irrigation system.
Authority
People's Committee of Hoi An Dong ward
Project management Type
The investor directly manages the project
Project approval ID
465/QĐ-UBND
Project approval date
05/05/2026
Approval authority
UBND phường Hội An Đông
Approval documents
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register
465.QD.UBND.05.05.2026.signed.signed.signed (1).pdf
Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Contractor selection plans Link
The project does not have any NTFP yet