Dredging and installing drainage ditch panels in hamlet 2, Hoa Hoi commune
Watching
Project
Overall procurement plan
Contractor selection plan
Project number
PR2500058146-00
Notice type
Real announcement
Project name
Dredging and installing drainage ditch panels in hamlet 2, Hoa Hoi commune
Project objective
Overcome poor drainage, limit local flooding in residential areas, especially during the rainy season. Increase road surface water drainage capacity, ensure smooth flow, contributing to protecting traffic infrastructure and neighboring works. Improve environmental sanitation and urban/rural aesthetics, reduce water pollution and odors from sedimentation in the drainage system. Ensuring traffic and daily safety for people.
Authority
Chairman of Hoa Hoi Commune People's Committee
Project management Type
The investor hired project management consultancy
Implementation location
Xã Hòa Hội, Ho Chi Minh city
Project approval ID
1028/QĐ-UBND
Project approval date
31/10/2025
Approval authority
UBND xã Hòa Hội
Approval documents
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register
4. QĐ phê duyệt dự án nạo vét mương và lắp đan ấp 2 xã Hòa Hội.pdf
Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Contractor selection plans Link
The project does not have any NTFP yet