Dredging combined with upgrading Ong Doc canal dike (DT4)
Watching
Project
Overall procurement plan
Contractor selection plan
Project number
PR2600046757-00
Notice type
Real announcement
Project name
Dredging combined with upgrading Ong Doc canal dike (DT4)
Project objective
Currently, the canal bottom elevation is relatively shallow from +0.40 to -0.30, affecting the process of pumping irrigation for production and cultivating agricultural land of people in the area. Recently, we have mobilized farmers in the area to voluntarily organize dredging of infield routes. However, for level II and level III canals, large funds must be used to implement them, so people are not qualified to meet them, so it is extremely urgent to organize investment in dredging silted canals as soon as possible.
Authority
Tran Quoc Phong
Project management Type
The investor hired project management consultancy
Project approval ID
1437/QĐ-UBND
Project approval date
06/07/2026
Approval authority
UBND xã Định Mỹ
Approval documents
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register
1437 PHE DUYET DA ĐT KENH ONG ĐOC.pdf
Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Contractor selection plans Link
The project does not have any NTFP yet