Drought, erosion and flood prevention project to adapt to climate change

Watching    
Project Overall procurement plan Contractor selection plan
Found: 09:47 04/12/2025
Project number
PR2500065616-00
Notice type
Real announcement
Project name
Drought, erosion and flood prevention project to adapt to climate change
Project objective
Contribute to the development of integrated water resources management; maximum effective use of water resources; regulate water sources between basins. Strengthen the province's resilience to more frequent climate fluctuations, especially periods of drought
Investor ID
vn4500671772
Authority
Pham Minh Tan
Project duration
4 Year
Project Category
Group B
Project management Type
The investor directly manages the project
Use of ODA funds
Yes
Implementation location
Xã Anh Dũng, ProvinceKhánh Hòa
Investment Total Value
To view full information please Login or Register
Project approval ID
137/QĐ-UBND
Project approval date
07/02/2025
Approval authority
UBND tỉnh Ninh Thuận
Approval documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Project versions
Contractor selection plans Link
The project does not have any NTFP yet
You did not use the site, Click here to remain logged. Timeout: 60 second