Embankment to prevent landslides on Lot River, Ninh Dong commune (section from riverbank of Phuoc Thuan village to Quang Dong village)

Watching          
Project Overall procurement plan Contractor selection plan Tender Notice Bid opening result Contractor selection result
Found: 15:35 14/10/2024
Project number
PR2400059345-00
Notice type
Real announcement
Project name
Embankment to prevent landslides on Lot River, Ninh Dong commune (section from riverbank of Phuoc Thuan village to Quang Dong village)
Project objective
To prevent landslides on the left bank of the Lot River, minimize local flooding when floods occur, protect productive land and infrastructure of people in the area, and contribute to stabilizing people's livelihoods. , creating a clean and beautiful environmental landscape, consistent with the local socio-economic development orientation.
Investor ID
vnz000014895
Authority
People's Committee of Ninh Hoa town
Project duration
3 Year
Project Category
Group C
Project management Type
The investor directly manages the project
Use of ODA funds
No
Implementation location
Thị xã Ninh Hoà, Khanh Hoa province
Investment Total Value
To view full information please Login or Register VNĐ
Amount in text format
Project approval ID
15823/QĐ-CTUBND
Project approval date
28/08/2024
Approval authority
Chủ tịch Uỷ ban nhân dân thị xã Ninh Hoà
Approval documents

Downloading files directly on the new Public Procurement System requires a computer using the Windows operating system and needs to install Client Agent software (Linux and MacOS cannot download Client software yet). ). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use our DauThau.info.
Our system will help you download files faster, on any device without installing Client Agent.To download, please Login or Register

QĐ phê duyệt dự án đầu tư kè sông Lốt.pdf
File can only be downloaded on Windows computers using Agent, please see instructions here!!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611

Contractor selection plans for this project

NO Contractor selection plan ID Contractor selection plan name Total investment
1
55.000.000.000 VND
Total amount
55.000.000.000 VND

Statistical table of bidding packages under the project

Statistics by type of bidding package Statistics by form Online bidding value (billion VND) Number of bidding packages whose results have been posted
Goods Civil Works Consulting Other categories Non-Consulting Online Offline
0 0 5 0 0 1 4 0.83 0
Greeting
Greeting,
You are not logged in, please log in to use our various functions for members.

You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!

If you are still not our member, please sign up.

Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.

Search for bid information
Click for advanced search
Statistical
  • 8849 Projects are waiting for contractors
  • 1240 Tender notices posted in the last 24 hours
  • 1877 Contractor selection plan posted in the last 24 hours
  • 25500 Tender notices posted in the past month
  • 39871 Contractor selection plan posted in the last month
You did not use the site, Click here to remain logged. Timeout: 60 second