Equipped with forklift forklifts for operation, repair and troubleshooting for electricity transmission company 2

Watching          
Found: 10:05 10/07/2025
Project number
PR2500041435-00
Notice type
Real announcement
Project name
Equipped with forklift forklifts for operation, repair and troubleshooting for electricity transmission company 2
Project objective
Strengthen the application of motor vehicles to ensure safety, minimize the risk of occupational accidents, occupational diseases and enhance work efficiency in the operation, repair and handling of electricity grid incidents.
Investor ID
vnz000021997
Authority
Director of Power Transmission Company 2 - Mr. Le Dinh Chien
Project duration
17 Month
Project Category
Group C
Project management Type
The investor directly manages the project
Use of ODA funds
No
Implementation location
Da Nang city
Investment Total Value
To view full information please Login or Register
Project approval ID
1438/QĐ-PTC2
Project approval date
30/06/2025
Approval authority
Công ty Truyền tải điện 2
Approval documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611

Contractor selection plans for this project

NO Contractor selection plan ID Contractor selection plan name Total investment
1
9.109.952.933 VND
Total amount
9.109.952.933 VND

Statistical table of bidding packages under the project

Statistics by type of bidding package Statistics by form Online bidding value (billion VND) Number of bidding packages whose results have been posted
Goods Civil Works Consulting Other categories Non-Consulting Online Offline
1 0 1 0 0 2 0 9.11 1
You did not use the site, Click here to remain logged. Timeout: 60 second