Equipping centralized UPS power system for telecommunications and IT equipment in building C30

Watching          
Found: 17:49 06/01/2023
Project number
PR2300000852-00
Notice type
Real announcement
Project name
Equipping centralized UPS power system for telecommunications and IT equipment in building C30
Project objective
Replacing the existing small UPS system which is old and not centrally planned; provide a stable and safe power source for telecommunications and IT equipment on all floors managed by NOC center and Southern MobiFone Network Center during operation and exploitation; completing infrastructure to meet site infrastructure standards at level 1, ensuring the safety of network operation and exploitation.
Investor ID
vnz000016707
Authority
General Director of MobiFone Telecom Corporation
Project duration
12 Month
Project Category
Group C
Project management Type
The investor directly manages the project
Use of ODA funds
No
Implementation location
Quận 10, TP.Hồ Chí Minh
Investment Total Value
To view full information please Login or Register
Project approval ID
Số 2184/QĐ-MOBIFONE ngày 30/12/2022
Project approval date
30/12/2022
Approval authority
Tổng Công ty Viễn thông MobiFone
Approval documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611

Contractor selection plans for this project

NO Contractor selection plan ID Contractor selection plan name Total investment
1
32.341.503.818 VND
Total amount
32.341.503.818 VND

Statistical table of bidding packages under the project

Statistics by type of bidding package Statistics by form Online bidding value (billion VND) Number of bidding packages whose results have been posted
Goods Civil Works Consulting Other categories Non-Consulting Online Offline
1 0 2 0 0 1 2 31.68 3
You did not use the site, Click here to remain logged. Timeout: 60 second