Handling flood points in areas 2 and 3A, Quang Hanh ward (adjacent to mountains and the investment project to build and operate infrastructure of urban residential areas south of road 18A-Km8).
Watching
Project
Overall procurement plan
Contractor selection plan
Project number
PR2500070200-00
Notice type
Real announcement
Project name
Handling flood points in areas 2 and 3A, Quang Hanh ward (adjacent to mountains and the investment project to build and operate infrastructure of urban residential areas south of road 18A-Km8).
Project objective
To overcome flooding, ensure quick drainage, and limit impact on residential life; improve the living environment for the community, reduce pollution of surface and underground water sources; Ensuring the safety of traffic infrastructure and neighboring works, avoiding erosion and damage to road surfaces and building foundations due to prolonged flooding; create conditions to attract investment, socio-economic development in the region, upgrade and embellish urban areas towards the goal of building Quang Ninh province into a city.
Authority
People's Committee of Quang Hanh Ward
Project management Type
The investor directly manages the project
Implementation location
Phường Quang Hanh, Quang Ninh province
Project approval ID
841/QĐ-UBND
Project approval date
11/11/2025
Approval authority
UBND phường Quang Hanh
Approval documents
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register
QĐ 841 UBND khu 2, khu 3A_0001.pdf
Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Contractor selection plans Link
The project does not have any NTFP yet