HDPE pipe line D90mm - L=2,118m
Watching
Project
Overall procurement plan
Contractor selection plan
Project number
PR2600000709-00
Notice type
Real announcement
Project name
HDPE pipe line D90mm - L=2,118m
Project objective
When investing in the HDPE D90mm - L=2118m pipeline project to ensure clean water supply for people along both sides of O Tre Road, Thanh Tri A hamlet, Chau Thanh commune, Vinh Long province.
Authority
The Board of Directors of Tra Vinh Water Supply and Sewerage Joint Stock Company
Project management Type
The investor directly manages the project
Implementation location
Xã Châu Thành, Vinh Long province
Project approval ID
242/QĐ-CTN
Project approval date
26/12/2025
Approval authority
CÔNG TY CỔ PHẦN CẤP THOÁT NƯỚC TRÀ VINH
Approval documents
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register
Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Contractor selection plans Link
The project does not have any NTFP yet