Hoa Phu Industrial Park Concentration Treatment Plant (phase 2)
Project number
PR2500023770-00
Notice type
Real announcement
Project name
Hoa Phu Industrial Park Concentration Treatment Plant (phase 2)
Project objective
Increase the capacity of centralized wastewater treatment plant
add 2,200 m3/day. Nights to meet the needs of wastewater treatment of factories and production facilities in Hoa Phu Industrial Park; Meet the requirements of the National Technical Regulation on industrial wastewater QCVN 40: 2011/BTNMT, gradually improve the technical infrastructure system of Hoa Phu Industrial Park
Authority
Chairman of Dak Lak Provincial People's Committee
Project management Type
The investor directly manages the project
Implementation location
TP.Buôn Ma Thuột, Dak Lak
Project approval ID
761/QĐ-UBND
Project approval date
31/03/2025
Approval authority
Ủy ban Nhân dân tỉnh Đắk Lắk
Approval documents
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register
Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Contractor selection plans for this project
| NO |
Contractor selection plan ID |
Contractor selection plan name |
Total investment |
|
1
|
|
45.368.672.000 VND |
Total amount |
45.368.672.000 VND |
Statistical table of bidding packages under the project
| Statistics by type of bidding package |
Statistics by form |
Online bidding value (billion VND) |
Number of bidding packages whose results have been posted |
| Goods |
Civil Works |
Consulting |
Other categories |
Non-Consulting |
Online |
Offline |
| 0 |
1 |
6 |
0 |
2 |
1
|
8 |
43.31
|
7
|