Improving sidewalks and drainage system on Vien Noi street (from Kim No intersection to Thiep river bridge), Van Noi commune
Watching
Project
Overall procurement plan
Contractor selection plan
Project number
PR2500073859-00
Notice type
Real announcement
Project name
Improving sidewalks and drainage system on Vien Noi street (from Kim No intersection to Thiep river bridge), Van Noi commune
Authority
People's Committee of Phuc Thinh commune
Project management Type
The investor directly manages the project
Implementation location
Xã Phúc Thịnh, Ha Noi city
Project approval ID
7257/QĐ-UBND
Project approval date
16/05/2025
Approval authority
UBND huyện Đông Anh
Approval documents
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register
QĐ PDCT đường Ngã 3 Kim Nỗ - Cầu Sông Thiếp (1).pdf
Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Contractor selection plans Link
The project does not have any NTFP yet