Improving the capacity of medium -voltage grid under the multi -division - multi -connection method (MDMC) supplemented by 2025 in Phuc Yen city - Vinh Phuc province
Watching
Project
Overall procurement plan
Contractor selection plan
Project number
PR2500049892-00
Notice type
Real announcement
Project name
Improving the capacity of medium -voltage grid under the multi -division - multi -connection method (MDMC) supplemented by 2025 in Phuc Yen city - Vinh Phuc province
Authority
General Director of Northern Power Corporation
Project duration
12 Month
Implementation location
Phu Tho province
Project approval ID
1437/QĐ-PCPT
Project approval date
04/09/2025
Approval authority
Công ty Điện lực Phú Thọ - Chi nhánh Tổng công ty Điện lực miền bắc
Approval documents
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register
20250903 QD PD BCKTKT MDMC bo sung 2025 Phuc Yen.pdf
Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Contractor selection plans Link
The project does not have any NTFP yet