Improving the reliability of medium-voltage power grid power supply using the multi-division - multi-connection (MDMC) method in the area of ​​the Luc Nam, Luc Ngan and Lang Giang Management Team in Bac Ninh province in 2026

Watching    
Project Overall procurement plan Contractor selection plan
Found: 10:40 22/01/2026
Project number
PR2600003153-00
Notice type
Real announcement
Project name
Improving the reliability of medium-voltage power grid power supply using the multi-division - multi-connection (MDMC) method in the area of ​​the Luc Nam, Luc Ngan and Lang Giang Management Team in Bac Ninh province in 2026
Project objective
Improving the reliability of medium-voltage power grid power supply using the multi-division - multi-connection (MDMC) method in the area of ​​the Luc Nam, Luc Ngan and Lang Giang Management Team in Bac Ninh province in 2026
Investor ID
vnz000022195
Authority
Director Do Quoc Long
Project duration
150 Day
Project Category
Group C
Use of ODA funds
No
Implementation location
Investment Total Value
To view full information please Login or Register
Project approval ID
4293
Project approval date
22/12/2025
Approval authority
CÔNG TY ĐIỆN LỰC BẮC NINH - CHI NHÁNH TỔNG CÔNG TY ĐIỆN LỰC MIỀN BẮC
Approval documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Contractor selection plans Link
The project does not have any NTFP yet