Install MBA T2 TBA 110kV Cao Loc, Lang Son Province
Watching
Project
Overall procurement plan
Contractor selection plan
Project number
PR2500047045-00
Notice type
Real announcement
Project name
Install MBA T2 TBA 110kV Cao Loc, Lang Son Province
Project objective
- Anti -overloading for MBA T1 TBA TBA Cao Loc TBA Cao Loc currently has a capacity of 85%, with Smax = 34MW/Sat = 40MVA;
- Ensuring electricity supply for old Lang Son city loads, areas with high requirements on electricity quality;
- Ensuring the reliability of electricity supply for Cao Loc, Loc Binh and old communal districts, the key districts are oriented to develop industry, trade, services and urban areas for the period 2021-2025;
- Support power supply back and forth with 110kV Lang Son TBA, 110kV Loc Binh TBA to meet TI
Authority
Mr. Nguyen Duc Thien
Project management Type
Specialized Management Board - Region
Implementation location
Xã Cao Lộc, Lang Son province
Project approval ID
718/QĐ-BDALĐ
Project approval date
30/08/2025
Approval authority
Ban QLDA lưới điện - Tổng Công ty điện lực miền Bắc
Approval documents
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register
QĐ duyệt FS Lắp MBA T2 TBA 110kV Cao Lộc, tỉnh Lạng Sơn.pdf
Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Contractor selection plans Link
The project does not have any NTFP yet