Installing MBA T2 TBA 110kV Son Dong, Bac Giang Province (now Bac Ninh province)
Watching
Project
Overall procurement plan
Contractor selection plan
Project number
PR2500048366-00
Notice type
Real announcement
Project name
Installing MBA T2 TBA 110kV Son Dong, Bac Giang Province (now Bac Ninh province)
Project objective
- Anti -overload for MBA T1 TBA 110KV Son Dong, reducing the load for MBAs at neighboring 110kV TBA; - Supply of electricity for people's loads in Yen Dinh commune and surrounding areas, Bac Ninh province;
- Ensuring N-1 criteria in the operation of 110kV TBA;
- Reduce power loss, improve the reliability of power supply to the regional grid;
- In accordance with the planning of Bac Giang province (now Bac Ninh province) in the period of 2021 - 2030, the vision to 2050 has been approved by the Prime Minister.
Authority
Mr. Nguyen Duc Thien
Project management Type
Specialized Management Board - Region
Implementation location
Xã Sơn Động, Bac Ninh province
Project approval ID
761/QĐ-BDALĐ
Project approval date
10/09/2025
Approval authority
Ban QLDA lưới điện - Tổng Công ty điện lực miền Bắc
Approval documents
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register
QĐ phê duyệt dự án Lắp đặt MBA T2 TBA 110kV Sơn Động 09.09.2025.pdf
Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Contractor selection plans Link
The project does not have any NTFP yet