“Installing RMU cabinets with remote monitoring and control functions on the underground medium voltage power grid in Thanh Xuan district in the period of 2024”; “Strengthening low voltage trunk lines and installing low voltage communication cabinets behind substations in Thanh Xuan district Spring 2024 (phase 2)”; "Installation of electrical communication cabinets at transformer stations in Thanh Xuan District in 2024"; "Installation of communication cabinets at transformer stations in Thanh Xuan District in 2024 (Phase 2)"

Watching          
Found: 17:12 19/06/2024
Project number
PR2400030902-00
Notice type
Real announcement
Project name
“Installing RMU cabinets with remote monitoring and control functions on the underground medium voltage power grid in Thanh Xuan district in the period of 2024”; “Strengthening low voltage trunk lines and installing low voltage communication cabinets behind substations in Thanh Xuan district Spring 2024 (phase 2)”; "Installation of electrical communication cabinets at transformer stations in Thanh Xuan District in 2024"; "Installation of communication cabinets at transformer stations in Thanh Xuan District in 2024 (Phase 2)"
Investor ID
vnz000015967
Authority
Director Dao Xuan Tuyen
Project duration
4 Month
Project Category
Group C
Project management Type
The investor directly manages the project
Use of ODA funds
No
Implementation location
Quận Thanh Xuân, Ha Noi city
Investment Total Value
To view full information please Login or Register VNĐ
Amount in text format
Project approval ID
3709/EVNHANOI-KH
Project approval date
06/05/2024
Approval authority
Công ty Điện lực Thanh Xuân
Approval documents

Downloading files directly on the new Public Procurement System requires a computer using the Windows operating system and needs to install Client Agent software (Linux and MacOS cannot download Client software yet). ). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use our DauThau.info.
Our system will help you download files faster, on any device without installing Client Agent.To download, please Login or Register

VB 3709EVNHANOI-KH.pdf
File can only be downloaded on Windows computers using Agent, please see instructions here!!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611

Contractor selection plans for this project

NO Contractor selection plan ID Contractor selection plan name Total investment
1
15.556.322.333 VND
2
15.556.322.333 VND
Total amount
31.112.644.666 VND

Statistical table of bidding packages under the project

Statistics by type of bidding package Statistics by form Online bidding value (billion VND) Number of bidding packages whose results have been posted
Goods Civil Works Consulting Other categories Non-Consulting Online Offline
1 1 1 0 0 3 0 10.08 3
Greeting
Greeting,
You are not logged in, please log in to use our various functions for members.

You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!

If you are still not our member, please sign up.

Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.

Search for bid information
Click for advanced search
Statistical
  • 8489 Projects are waiting for contractors
  • 231 Tender notices posted in the last 24 hours
  • 213 Contractor selection plan posted in the last 24 hours
  • 24180 Tender notices posted in the past month
  • 37668 Contractor selection plan posted in the last month
You did not use the site, Click here to remain logged. Timeout: 60 second