Investing, renovating and upgrading TBA TBA 110kV Long Khanh

Watching    
Project Overall procurement plan Contractor selection plan
Found: 13:33 03/12/2025
Project number
PR2500065283-00
Notice type
Real announcement
Project name
Investing, renovating and upgrading TBA TBA 110kV Long Khanh
Project objective
- Replace equipment that has been in operation for a long time and has deteriorated, which often occurs Unusual conditions of damage, despite many repairs, still persist completely overcome, there is a risk of affecting future power supply operations hybrid. - Ensure safe, reliable and continuous electricity supply. - Prevent incidents due to equipment damage. - Enhance the load carrying capacity of the device to meet N-1 criteria
Investor ID
vn3600432744
Authority
Mr. Truong Dinh Quoc
Project duration
2 Year
Project Category
Group C
Project management Type
The investor directly manages the project
Use of ODA funds
No
Implementation location
Dong Nai province
Investment Total Value
To view full information please Login or Register
Project approval ID
2715/QĐ-PCĐN
Project approval date
19/11/2025
Approval authority
CÔNG TY ĐIỆN LỰC ĐỒNG NAI – CHI NHÁNH TỔNG CÔNG TY ĐIỆN LỰC MIỀN NAM TNHH
Approval documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Contractor selection plans Link
The project does not have any NTFP yet
You did not use the site, Click here to remain logged. Timeout: 60 second