Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
DauThau.info discovered that this project's data collected from the new National Bidding Network System has differences in the investor compared to the data on the old system as follows:
⚬ New system: VINACOMIN - MAO KHE COAL COMPANY
⚬ Old system: Công ty than Mạo Khê-TKV
In addition, the bidding information related to this project also has discrepancies regarding the investor, specifically:
- The following contractor selection plans have the investor :
⚬ Investment in equipment for production - in 2019
- The following bidding packages have the investor Chi nhánh Tập đoàn Công nghiệp Than khoáng sản Việt Nam Công ty than Mạo Khê TKV:
⚬ Tender package number 18: Mobile anti-hydraulic rack
⚬ Package No. 1: Ventilation equipment
⚬ Package 6: Supplementing the information and propaganda system with images
⚬ Package 14: Multi-function gas meter
⚬ Package No. 19: Iron cutting saw (circular saw)
⚬ Package #7: 3-ton dump truck, people-carrying cart and coal-loading chute
⚬ Package 15: Rescue equipment
⚬ Package 8: Electric train with battery 8 tons, K=900mm
⚬ Package No. 11: Dump truck
⚬ Package No. 17: Mine Shooting Machine
⚬ Package No. 10: Water car for watering the road
⚬ Package No. 4: Mine drainage system
⚬ Package 12: Electrical equipment in the pit
⚬ Package 2: Gas supply equipment for underground mines
⚬ Package 13: Gas monitoring equipment
⚬ Package No. 3: Pumping underground water
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register
Contractor selection plans for this project
| NO | Contractor selection plan ID | Contractor selection plan name | Total investment |
|---|---|---|---|
|
1
|
86.324.836.000 VND |
||
Total amount |
86.324.836.000 VND |
||
Statistical table of bidding packages under the project
| Statistics by type of bidding package | Statistics by form | Online bidding value (billion VND) | Number of bidding packages whose results have been posted | |||||
|---|---|---|---|---|---|---|---|---|
| Goods | Civil Works | Consulting | Other categories | Non-Consulting | Online | Offline | ||
| 0 | 0 | 0 | 0 | 0 | 0 | 21 | 0.00 | 16 |